10 Procurement Case Studies: Examples & Lessons Learned in '24

Headshot of Cem Dilmegani

Effective procurement practices are crucial across all industries. By examining procurement case studies, we gain valuable insights into the impact of procurement solutions and best practices that can drive success in any industry.

Explore a range of procurement case studies that showcase how organizations in various sectors— non-profit , technology, healthcare , and beyond—have leveraged innovative procurement strategies to overcome challenges and enhance overall efficiency:

Procurement case studies from different industries

By examining procurement case studies from different sectors, we can uncover how organizations have leveraged innovative solutions to address challenges, optimize operations, and achieve remarkable results.

1. Real-life example from energy & utilities sector

The leading utility company faced significant supply chain constraints that extended lead times for crucial transformers and electrical equipment to over two years, jeopardizing their expansion plans and project timelines. 1

A procurement software vendor partnered with the utility company to secure future production slots, negotiate favorable contract terms, and streamline internal processes. This collaboration resulted in a 5% cost reduction through competitive bidding, standardized pricing adjustments, and the creation of unique material codes for better forecasting and budgeting in future projects.

Lessons learned

The case highlights the importance of strategic supplier partnerships, direct negotiations to mitigate supply risk, and the value of streamlining internal processes to improve efficiency and cost savings in procurement.

2. Real-life example from oil & gas sector

A leading global oil and gas company faced inefficiencies, data silos, and governance issues in its procurement process due to reliance on 15 legacy custom solutions, which led to delays, a lack of visibility, and an overly complex approval system. 2

The procurement software vendor implemented its intelligent category management (ICM) system, consolidating the 15 legacy solutions into two centralized systems. This solution digitized contracts, increased eSourcing adoption by 20%, improved procurement ROI by 15%, and provided real-time insights to enhance category strategies, supplier relationships, and overall procurement efficiency. 3

The case demonstrates the benefits of consolidating and centralizing procurement systems, leveraging real-time data and insights for strategic decision-making, and using intelligent category management to improve efficiency, cost savings, and risk management in procurement.

3. Real-life example from the healthcare sector

For more information, check Healthcare Procurement Challenges & Effective Solutions .

Memorial Hospital of Sweetwater County faced frequent system failures and limited access to budget details during the purchasing process due to a problematic general ledger system, leading to workflow interruptions and high error frequency. 4

The procurement software provided a requisition solution that offered accurate budget reporting, visibility and transparency throughout the purchasing process, and seamless integration with the hospital’s materials management and ERP systems. This led to improved processing times, reduced errors, and enhanced efficiency.

The case underscores the importance of adopting tailored procurement solutions to overcome system inefficiencies, reduce errors, and streamline operations, leading to significant improvements in budgeting, transparency, and procurement professionals satisfaction. Technology can help procurement teams streamline their processes and improve communication with different suppliers.

4. Real-life example from the non-profit sector

For more information, check Nonprofit Procurement: Checklist & Challenges .

Central Park Conservancy faced a lack of control and chaotic ordering due to a paper-based requisition system that hindered tracking, approvals, and efficient order placement. 5

The procurement software vendor provided an integrated electronic procurement solution that included customized workflows, audit trails, and seamless integration with Blackbaud Financial Edge, enabling accurate tracking of expenditures, encumbrances, and accruals.

The implementation of procurement software significantly streamlined the procurement process, reinforced purchasing policies, and enhanced spend management, leading to improved efficiency, time savings, and better control over financial operations.

5. Real-life example from the financial sector

Hellenic Bank faced a lack of standardization, centralization, and digitalization in its procurement processes, leading to inefficiencies, high costs, and a need for improved compliance with regulatory requirements. 6

The bank implemented an AI-powered source-to-pay software to centralize procurement activities, streamline operations, and integrate key processes such as risk assessment, supplier management, and contract management. The deployment was phased, starting with the source-to-contract module and extending to procure-to-pay functionalities.

For more information, check 10 AI Procurement Use Cases & Case Studies .

The implementation of the procurement tool led to a significant transformation in procurement operations at Hellenic Bank, resulting in standardized processes, enhanced visibility, reduced cycle times, stronger supplier partnerships, and strategic insights. The bank also anticipates further benefits, including cost reductions and improved compliance, as they fully integrate their procurement activities on a single platform.

6. Real-life example from the construction sector

High Speed 2 Ltd. faced the greatest challenge of achieving supply chain transparency and resiliency for the UK’s largest infrastructure project. This involved managing a large number of suppliers and contractors in a complex market, with costs and risks exacerbated by external factors like hyperinflation and labor shortages. 7

HS2 implemented the supply chain management initiative, a focused approach using data-driven collaboration with suppliers to ensure transparency and mitigate risks. The effort involved mapping and assessing critical contracts and suppliers across multiple tiers, leveraging dashboards and innovative methods to deliver valuable insights into the supply chain.

The case study shows that commitment to collaboration and proactive risk management can achieve significant advancements in supply chain transparency, maintaining quality, and ensuring better deals for organizations. HS2’s successful development of supply chain management allowed them to focus on immediate needs, securing value for taxpayers by understanding and managing risks in real-time.

7. Real-life example from the chemical sector

Bioscience company Royal DSM N.V. (DSM)’s indirect procurement processes were fragmented, leading to inefficiencies and excessive time spent on operational tasks, detracting from value-creating activities. The purchase-to-pay process was also suboptimal, with potential payment delays introducing risk. 8

DSM implemented a procurement software solution to digitalize and automate procurement transactions. This included a comprehensive source-to-pay process supported by a robust governance structure and global rollout, starting with a pilot in Brazil to navigate complex tax regulations.

Starting the transformation in a region with complex tax systems, like Brazil, allowed DSM to learn valuable lessons that simplified the global rollout. Effective change management and extensive training, including local language support, were crucial for the successful adoption and deployment of the new procurement processes.

8. Real-life example from the transportation sector

Transport for London (TfL) faced a severe skills shortage and lack of diversity in the transport industry, with a workforce predominantly composed of older white males, while a significant portion of young Londoners were unemployed or out of education. 9

TfL established the Supplier Skills Team and implemented Strategic Labour Needs and Training (SLNT) requirements in contracts. This approach required suppliers to deliver specific skills and employment outputs, with a focus on apprenticeships and job starts for disadvantaged groups. TfL also partnered with charities and employability groups to support these efforts.

Successful outcomes were driven by strong internal buy-in, clear communication of goals with suppliers, effective partnerships with the right organizations, and recognition of achievements. TfL’s approach has led to thousands of apprenticeships, job placements, and the employment of disadvantaged individuals, setting a standard now being adopted by other public sector bodies.

9. Real-life example from the technology sector

Jumio faced challenges in managing its procurement and accounts payable processes , particularly with manual purchase order (PO) matching, which caused bottlenecks and inefficiencies, especially as the company scaled globally across multiple subsidiaries. 10

Jumio implemented an integrated procure-to-pay finance automation solution, which automated PO and invoice processing, self-service supplier onboarding, and improved month-end reconciliation.

Automation of procurement and accounts payable processes significantly reduced workload, improved efficiency by eliminating manual tasks, accelerated financial reconciliation, and ensured seamless integration with their ERP system.

10. Real-life example from the education sector

Pearson, a global leader in education, struggled with disjointed procurement systems that lacked comprehensive spend visibility and compliance enforcement, hindering strategic decision-making. 11

Pearson implemented a business spend management platform to unify their procurement processes, improve risk management, enhance compliance, and achieve better deals, with a focus on user-friendly adoption.

The integration of the procurement software platform significantly increased spend compliance from 22% to 85%, reduced operational inefficiencies, and resulted in high user satisfaction, demonstrating the value of streamlined procurement processes.

Summary of lessons learned from the procurement case studies

  • Procurement software integration significantly increased spend compliance and reduced operational inefficiencies.
  • Automation improved efficiency, reduced manual tasks, and streamlined financial processes.
  • Effective change management and training were crucial for successful adoption.
  • Commitment to collaboration and proactive risk management enhanced supply chain transparency and efficiency.
  • Centralizing procurement systems and using real-time data led to better decision-making and cost savings.

What is a sustainable procurement process?

Sustainable procurement is a critical part of supply chain management, aiming to reduce energy consumption and environmental impact. Companies like Walmart have implemented sustainable procurement strategies to reduce their carbon footprint. 12 Sustainable procurement can have a significant impact on the environment and the bottom line.

What is supply chain optimization?

Optimizing the supply chain is a key aspect of procurement, involving the management of parties involved in the procurement process. Competitive bidding and digital solutions can help procurement teams streamline their processes and reduce costs. Data obtained from supply chain optimization can provide detailed information on procurement processes and help procurement professionals make better decisions. Procurement teams play a critical part in the procurement process, requiring strategic goals and specific contracts to achieve success.

Further Readings

  • Top 10 Procurement Software Features & Pr i ces Analyzed
  • 10 AI Procurement Use Cases & Case Studies
  • Non-profit procurement: Checklist & Challenges
  • Healthcare Procurement Challenges & Effective Solutions
  • Procurement Software Comparison, Testing & Benchmarking

If you need further help in finding a vendor or have any questions, feel free to contact us:

External Links

  • 1. Leading Utility Mitigates Supply Risk and Reduces Costs With GEP . GEP SMART. Accessed: 20/August/2024.
  • 2. How a Fortune 500 Oil & Gas Major Partnered With GEP To Achieve a 15% Jump in Procurement ROI . GEP Smart. Accessed: 20/August/2024.
  • 3. How a Fortune 500 Oil & Gas Major Partnered With GEP To Achieve a 15% Jump in Procurement ROI . GEP Smart. Accessed: 20/August/2024.
  • 4. Memorial Hospital of Sweetwater County Reduces Costs with PairSoft . PairSoft. Accessed: 20/August/2024.
  • 5. PairSoft Helps Central Park Conservancy Streamline Procurement . PairSoft. Accessed: 20/August/2024.
  • 6. How Hellenic Bank Transformed Its Indirect Procurement Operations With GEP Software . GEP Smart. Accessed: 20/August/2024.
  • 7. High Speed 2’s approach to building supply chain transparency . Procurement leaders. Accessed: 21/August/2024.
  • 8. DSM: Digitalizing global procurement processes for strategic source-to-pay capability . SAP Ariba. Accessed: 21/August/2024.
  • 9. Working with suppliers to achieve social opportunities . PROCURA+. Accessed: 21/August/2024.
  • 10. Jumio Fights Fraud By Delivering a Smarter Identity Verification Experience . Tipalti. Accessed: 21/August/2024.
  • 11. Pearson Gets an A in Business Spend Management . Coupa. Accessed: 21/August/2024.
  • 12. Product Supply Chain Sustainability . Walmart. Accessed: 20/August/2024.

Headshot of Cem Dilmegani

Next to Read

Healthcare procurement challenges & effective solutions in ‘24, 10 ai procurement use cases & case studies in 2024.

Your email address will not be published. All fields are required.

Related research

Procurement Software Pricing: A Comprehensive Guide in 2024

Procurement Software Pricing: A Comprehensive Guide in 2024

Top 12 Use Cases of RPA in Procurement Process in 2024

Top 12 Use Cases of RPA in Procurement Process in 2024

Procurement Tactics

Written by Marijn Overvest | Reviewed by Sjoerd Goedhart | Fact Checked by Ruud Emonds | Our editorial policy

Procurement Strategy Case Studies — 5 Insightful Examples

Table of content

  • InDemand’s co-creation model
  • Copenhagen supplies seasonal and diverse organic fruit and vegetables
  • Catalonia’s aim to clean air
  • The Ministry of Defense of the Kingdom of the Netherlands procuring textiles
  • Combining procurement models
  • Procurement Expert’s Insights 
  • Frequently Asked Questions

Key takeaways

  • Procurement strategy case studies are real-life examples of how organizations make purchases, showcasing the challenges and decisions they encounter.
  • Successful strategies depend on efficient coordination and collaboration between essential procurement players.
  • Knowing the factors affecting procurement strategizing helps build better procurement outcomes for the company.

Setting the appropriate strategy in procurement is the first step to improving control and effectiveness of the procurement and sourcing activities. However, not everyone knows where to start in their strategy. 

In this article, we will check five procurement strategy case studies that can give you insight into strategies they have used to streamline their processes. We will explore the problems that arise and how they have conquered them with their strategy. 

After reading this article, you will gain enough knowledge on tackling the problems in your procurement by formulating your very own strategy. So, I’d like to make your procurement process more effective than before!

But before you read the whole article, I have created a free-to-download editable procurement strategy template. It’s a PowerPoint file you can use to create your own strategy. I even created a video where I’ll explain how you can use this template.

Example 1 — InDemand, Co-creation Model Helping to Procure Innovation in Public Organizations

Actual case:.

InDemand brought together procurers from three different European Regions namely: Murcia, Oulu, and Paris to test a new co-creation model which is said to be a model that is faster, leaner, and requires fewer resources and overheads. Thus, being more suited to everchanging technologies, such as digital solutions. 

InDemand aims to help promote innovation by combining what the clients need (health professionals of the Murician Health Service), and the development of the solutions in the process of co-creation (a collaboration of health professionals together with tech companies). 

The Murician Health Service (EPICO), used the InDemand model to know the challenges of enhancing accessibility for and follow-up epileptic patients. Thus, a call to companies to co-create an innovative solution alongside clinicians commenced. 

After a tender process was launched, Oxiframe (renamed Aircrum IT) was selected to work together with neurologists and patients. After the engagement process, Servicio Murciano de Salud (SMS) prepared an open tender for a solution. Thus, a bigger company named PULSO won the bid and collaborated with Oxiframe to make an innovative solution. 

Final Deal:

The InDemand model has been leveraged to more than 50 procurement innovation projects. It is estimated that more than 200 organizations submitted a bid for the different calls based on the InDemand model from the numerous procurement organizations. 

Additionally, there was a 100% acceptance of the tool which was found to truly help improve communication between doctors and their patients affected by epilepsy. It has heightened patient satisfaction by up to 50% and led to a quality of life improvement for direct communication between doctors and their patients. 

After the success, it was then tested on 54 patients at the Hospital of Cartagena for 2 months and eventually tested on a wider group. Thus, it is a great example of how to use a co-creation model with companies together with clinicians and their patients. 

What Can We Learn From It?

We can learn here that demand-driven co-creation works, at least in the healthcare sector, to address the problems perceived by parties involved in the creation of a solution. 

Together with the clinicians and the patients, the collaboration worked well. The exchange of ideas, needs, solutions, standard practices, and legal limitations has become a valuable component to co-create an innovative solution. 

Example 2 — The City of Copenhagen Supplying Seasonal and Diverse Organic Fruit and Vegetables

Copenhagen, the most populous city of Denmark, has set a target for 90% of the food served in municipal facilities to be organic. It has also ensured that it was buying seasonal produce to support efforts of strengthening biodiversity in agricultural production in both Danish and foreign producers. 

It is important to note that “seasonality” is not meant to be the seasons in Denmark. Rather, it defines the season somewhere in the world helping to ensure fairness and transparency. 

Furthermore, an extensive market engagement was conducted to ensure the requirements were ambitious and also achievable. The bidders were also asked to complete the “seasonal wheels’ to demonstrate the varieties of the typically used products available throughout the year. 

The first contract was issued in January 2014. However, the tender was abandoned due to multiple errors seen in the bids. The contract was reissued in April 2014. Seven tenders were then submitted and only two of those met the requirements. After that, the contract was awarded in July 2014. 

The innovation in the supply and delivery of products, improved relationships with the suppliers, and greater sustainability initiatives in sourcing food were all positive results of the extensive market dialogue. 

Additionally, the organic food market in Denmark has remarkably grown in recent years and the organic food service market increased up to 33% between the years 2013 and 2014. 

We should take note that there is a risk in carrying out the innovation procurement process that is susceptible to being abandoned due to a lack of competition. The extensive market engagement Copenhagen has done can be time-consuming. 

However, by building a strong knowledge of the market, it is achievable to produce realistic yet innovative specifications or requirements to attract necessary competition. 

Example 3 — Catalonia’s Aim to Clean Air through Clean Vehicle Procurement

Catalonia is an autonomous region in Spain. Its government has passed the responsibility for certain legislative and policy areas, including the environment. The Ministry of Territory and Sustainability is the expert body for environmental policies and leads the promotion of Green Public Procurement in Catalonia. 

The Catalonia government uses GPP to support numerous strategic policies such as reducing negative impacts of consumption and production, promoting eco-innovation and transformation, and supporting other policies that pursue sustainable objectives. 

The government of Catalonia focuses on low-carbon vehicles that align with wider environmental priorities within the region. Air pollution is a specific concern within the wider urban area of Barcelona where nitrogen oxide exceeds the annual limit. 

An Air Quality Plan of the Metropolitan Area of Barcelona has brought 40 municipalities together to solve the air pollution problem. Catalonia’s Government approach to combat air pollution is to provide guidelines on the GPP vehicles, government agreements regarding GPP, eco-labeling to identify low-carbon vehicles and the LIVE platform which is a public-private platform promoting sustainable mobility. 

The GPP guidelines laid out clear and simple criteria that public procurers procurement can follow to buy low-emission vehicles, as well as consider the use of vehicle fleets in the delivery of service contracts. It also includes the maximum energy consumption and technical specifications of the award criteria. 

Additionally, the Catalonia government supports the Catalan Ecolabelling. It is a regional voluntary ecolabel awarded to products and services that fulfill specific environmental quality requirements beyond what is compulsory under the current regulations. 

The result of vehicle-related tenders in the Catalonia region has produced positive impacts on the environment. It is estimated that through its procurement strategy, it has produced energy savings of 2,120 Tons of Oil Equivalent (TOE) and a reduction of 7,166.7 tons of carbon emissions compared to benchmark levels. 

Catalonia’s government approach demonstrates that procurement can play a significant role in contributing to wider environmental policies and public health goals. 

Additionally, by aligning the EU national and regional policies, it is achievable to send a clear message to markets and the citizens of Catalonia about the importance of the environment through sustainable activities. 

Procurement Learning Journey Assessment

Example 4 — The Ministry of Defense of the Kingdom of The Netherlands Procuring Textiles Made From Recycled Fibers

The Ministry of Defense of the Kingdom of the Netherlands (MODNL) is a large public sector buyer that employs around 58,000 people across the army, military police, air force, and other supporting roles. 

It is also one of the 45 public sectors and private parties brought together by the Dutch Government’s Circular Procurement Green Deal, tasking participants in carrying out two circular procurement initiatives between the years 2014 and 2016 to increase knowledge and accelerate the transition to a circular economy. 

One of the areas of focus of MODNL was textiles because it needed to equip its large numbers of personnel with uniforms and other textile products. However, textile production is linked with numerous environmental and social problems. Ultimately, the energy to transform raw materials and manufacture new fibers in the production of textiles has great carbon emissions. 

Therefore, the MODNL began exploring the market for recycled textiles in January 2014 by publishing a request for information and conducting an open meeting with the textile suppliers. This market engagement aimed to know if it is possible to require recycled fibers to be used in the production of certain items. 

Through its market research , it identified that manufacturers were able to meet the requirements around the use of recycled content. However, MODNL must focus on the items’ ability to perform their use rather than the technical values such as the tensile strength. 

The contracts awarded in June 2016 are worth approximately $455,000 for towels and washcloths and $1.46 million for overalls. Only six suppliers submitted their bids and only four of them met the tender requirements. 

Now, two Belgian companies supply the MODNL with towels, washcloths, and overalls. The parties will innovate during the four-year term which could result in a higher percentage of recycled materials later on in the execution of the contract.

Subsequently, a separate eight-year contract was also signed for reuse services where a third party was contracted to sort items of clothing for reuse and resale with income being returned to MODNL. Thus, it results in considerable savings for the MODNL.  

Circular procurement needs suppliers to find alternative inputs and new ways of working. Thus, to assist innovation, the market engagement conducted by the MODNL found that functional rather than technical specifications provided suppliers with more space to innovate and find new ways to meet the MODNL’s material needs. 

We can learn here that when asking the market to work with new materials or in an innovative way, it is necessary to give them more lead-in and response time to consider and prepare non-traditional offers. 

Moreover, it is important to take note that you should not introduce price ceilings based on existing prices, and costs, as expected on a pilot test, can constrain the development potential of new areas. 

Example 5 — Combining Procurement Model For Sustainable Buildings

The South Moravian Region has over a million inhabitants and is the fourth-largest region in the Czech Republic. The landscape of the region is distinguished by its highlands as well as the Moravian Karst. The abundance of caves and gorges provides ideal conditions to treat respiratory diseases. 

The regional government aims to build a new treatment facility for respiratory diseases near the town of Ostrov u Macochy. The procurement approach was set up to give the market the chance to show the best they can offer to create the building as aesthetically pleasing, energy-efficient, and a comfortable place for patients. 

The process includes preliminary consultation and market dialogue to test the feasibility of the procedure and to provide a detailed description of the planned procurement process and requirements of the tenders. 

Furthermore, the procurement procedure combined various methods to filter the bids. The tender itself was awarded using a combination of a competitive procedure with negotiation and an architectural design contest. 

The preparation of the tender process started in April 2018 and the procurement commenced in April 2019 with a total contract value of $6 million. 

Seven suppliers submitted their bids which were to be assessed by an expert independent evaluation committee that recommended the exclusion of one supplier due to flaws in its bid. 

The remaining were then evaluated according to set criteria which are based on the reports of the expert examiners who examined in detail the values offered in the quality of technological and energy solution criteria. 

The contract was awarded to the selected contractor in April 2020. Since then, the construction started in June 2021 and is expected to be done by the end of 2022.

The winning bidder offered numerous sustainable solutions including reusable components of the main construction and interior design layout that enables simple layout adjustments that may be done in the future. The successful bidder also committed to achieving a reduction in the annual consumption of non-renewable primary energy. 

We can learn here that preliminary market consultations are crucial when the contracting authority undertakes a new approach to procurement. Additionally, it is important to present the intentions and goals to potential suppliers, get feedback from the market, and find other information significant to prepare the procurement process. 

All parties involved in the preparation of the actual procurement process were sent a request to identify the strengths and weaknesses of the procurement process they utilized. 

Using the BIM method leads to better execution and more efficient operation of the building. Furthermore, as the tender used numerous methods, it is significant to see the effectiveness of the DB approach as it can be an interesting and legitimate way for contractors to implement large-scale projects. 

Procurement Expert’s Insights on Procurement Strategy Case studies

For this article, we asked an experienced procurement expert to share her insights to help answer common questions about case studies regarding procurement strategy.

Nesrin Chabbah Senior Lead Buyer

LinkedIn Profile: linkedin.com/in/nesrin-chabbeh

1. What do most people get wrong about procurement strategy case studies?

“What’s commonly misconceived about procurement strategy, as evident in the given cases, is its potential to profoundly influence organizational objectives beyond mere acquisition efficiency. Procurement transcends simple procurement; it’s a strategic instrument capable of propelling innovation, sustainability, and social advancements. These examples underscore how procurement, when meticulously strategized and implemented, can yield positive effects not just on operational efficiency but also on the environment, public health, and society at large. It involves harmonizing procurement with grander visions and engaging stakeholders for impactful results.”

2. What should people know about procurement strategies if they are planning to start working on this?

“For those embarking on the journey of devising procurement strategies, understanding that it’s not merely about obtaining goods and services is pivotal. Procurement strategy extends to shaping innovation, sustainability, and social responsibility. Effective strategies align with broader organizational goals, incorporating sustainability, ethical sourcing, and fostering supplier relationships. Engaging stakeholders and fostering transparency is vital for success. Moreover, the ability to adapt strategies to emerging technologies and market shifts is essential for staying competitive and achieving long-term success in procurement.”

3. From your experience, what is the most important thing you learned about procurement strategy case studies?

“The core lesson in mastering procurement strategy is understanding its dynamic and multifaceted nature. It extends beyond the efficient acquisition of goods and services; it encompasses supply chain optimization, innovation encouragement, sustainable practices, and fostering strong supplier relationships. Crafting an effective strategy demands comprehensive knowledge of market dynamics, legal considerations, risk mitigation, and emerging technologies. Flexibility and adaptability are paramount, as strategies must evolve in response to evolving business landscapes and shifting consumer demands. Ultimately, a well-crafted procurement strategy profoundly influences an organization’s overall performance and its capacity to meet objectives both effectively and responsibly.”

4. What tips can you give them to be effective in procurement strategies?

“To ensure an effective procurement strategy, it’s crucial to align with organizational objectives and understand needs and goals thoroughly. Employ data-driven decision-making, leveraging insights for optimal choices. Prioritize risk management by identifying and mitigating potential supply chain risks. Cultivate strong, transparent relationships with suppliers, adhering to compliance and ethical standards. Foster a culture of continuous improvement, integrating sustainability practices, and optimizing costs through strategic negotiations. Maintain clear communication channels and invest in team training for skill development. Regularly measure performance and adaptability, embracing change as a part of the process. By following these guidelines, you can enhance your procurement strategy and achieve better outcomes.”

5. Can you give us examples of procurement strategy challenges and how you solved them?

“Monitoring supplier performance and their resilience posed significant challenges. However, implementing Key Performance Indicators (KPIs), conducting monthly meetings, improving communication, and setting clear goals engaged suppliers, fostering responsibility and driving them to deliver their optimal results.”

The five insightful procurement strategy case studies offer valuable lessons for organizations seeking to enhance their procurement processes.

These case studies emphasize the importance of understanding market dynamics, engaging stakeholders, aligning procurement with broader policy objectives, and fostering innovation through collaboration.

By drawing insights from these examples, organizations can tailor their procurement strategies to address specific challenges and achieve more effective and sustainable outcomes.

Frequently asked questions

What is a procurement strategy case study.

A procurement strategy case study is a real-world example of how organizations buy things, showing the challenges and choices they face.

What types of procurement strategies are commonly explored in case studies?

Case studies may cover a range of procurement strategies, including strategic sourcing, supplier relationship management, e-procurement, cost optimization, and sustainability initiatives.

What can organizations learn from mistakes in case studies?

Case studies highlight mistakes made by others, offering useful insights into what went wrong and how to avoid similar issues for better outcomes.

About the author

My name is Marijn Overvest, I’m the founder of Procurement Tactics. I have a deep passion for procurement, and I’ve upskilled over 200 procurement teams from all over the world. When I’m not working, I love running and cycling.

Marijn Overvest Procurement Tactics

  • Contact sales

Start free trial

Project Procurement Management: A Quick Guide

ProjectManager

Every business needs resources such as labor, raw materials, equipment and other inputs. Your team uses resources to execute a variety of projects such as making products or providing services. These resources must be purchased by your organization, and the procurement process must be carefully planned and executed. That’s what procurement management is all about.

case study project procurement management

Get your free

Purchase Order Template

Use this free Purchase Order Template for Excel to manage your projects better.

What Is Procurement Management?

Procurement management refers to all the actions and strategies related to the cycle of identifying, evaluating and selecting suppliers of production inputs. This involves creating a procurement management plan, testing quality, managing procurement contracts, executing purchases and any other activity that’s needed to control how purchases are made in your organization.

ProjectManager is ideal to keep track of your production plans so you can better estimate when you’ll need to purchase equipment, materials, parts or anything needed for your projects. Use our Gantt charts to map out the tasks in your production process, automate workflows with kanban boards and keep track of costs with workload charts and timesheets. Get started for free today.

Gantt chart for manufacturing procurement ProjectManager

The term procurement management is confused with purchase management by most people, but there’s a big difference that’s very important in business, manufacturing and project management alike. Here’s how these two similar concepts differ.

Procurement Management vs. Purchase Management

Purchase management is just a small part of procurement management, which is larger and more strategic. Purchase management is simply the set of documents, tools and procedures used to manage the purchase process, such as purchase requisitions, requests for quotes and purchase orders.

What Is Project Procurement Management?

Procurement, in terms of project management, is when you need to purchase, rent or contract with some external resource to meet your project goal. These relationships, like any process in the project, need management.

Managing these relationships means getting the best quality from the outside vendors employed by the company to assist in doing business. There are vendor management constraints that revolve around cost and time. Procurement management is a way to more efficiently and productively handle the process of sourcing, requisitioning, ordering, expediting, inspecting and reconciliation of procurement.

However, before making partnerships or purchases, the question of whether the goods and services are required from outside vendors must be answered. Weigh the pros and cons of producing the goods or services in-house and contracting the workout. Is the relationship with outsider companies necessary and cost-effective in the long term? Once an informed decision has been made, only then can you move forward with confidence that the steps you’re taking are financially sound and fit within your timeframe.

What Is a Procurement Management Plan?

A procurement management plan outlines the procurement requirements, guidelines and overall process that’ll be followed by an organization for a particular project. The level of complexity and detail of a procurement management plan varies from one organization to another, but at a basic level, your procurement management plan should:

  • Define evaluation criteria for the selection of suppliers
  • Outline the bidding process
  • Identify the cost methodology to be used
  • Include a cost-benefit analysis
  • Explain why procurement activities are needed and how they align with the organization’s strategic goals.
  • Set a timeline for procurement activities
  • Identify procurement management stakeholders
  • Define KPIs for procurement activities
  • List any resource constraints or project assumptions that might affect procurement activities
  • Define general legal & payment terms
  • Explain the different procurement management roles & responsibilities
  • Include the estimated costs for the procurement project
  • List potential risks that might affect purchasing and any mitigation strategies
  • Include procurement contracts and documentation such as purchase requisitions, purchase orders, requests for proposals and requests for quotes

Procurement Documents

Several documents are needed for the procurement process. Here are some of the most important ones.

Request for Information (RFI)

This document is used for a formal information-gathering process. It’s directed towards those suppliers of goods and services with which you might want to contract. The RFI helps procurement managers find the supplier who’ll deliver what they need and when they need it for a price with which they’re comfortable.

Request for information template

Request for Proposal (RFP)

When an organization is looking to contract with a vendor or contractor, it’ll send out an RFP that explains what they want to be done. The document then captures the description and price of doing that work by a variety of entities, where one can be chosen as they offer the best all-around deal.

Request for proposal template

Request for Quotation (RFQ)

This process is used to ask a vendor or vendors to submit their price quotes for items that will be used in a project or other venture. This allows the sender to compare prices with other potential vendors who are vying for the job. It’s an essential part of making the right decision about who to contract with.

Request for quote template

Procurement Management Process

Once you’re ready to procure goods from a vendor, project procurement management is broken down into four processes.

1. Plan Procurement Management

Procurements are first identified during the planning phase of the project. For every external contractor, there needs to be a statement of work (SOW) to serve as a document outlining the work being contracted.

Statement of work template

Before the contract, however, is a request for proposal in which multiple contractors get to bid on the job, and the project manager can determine from their bids who will get the contract.

These requests are well-thought-out as they work as guiding documents throughout the project. The more specific, the better. This avoids confusion later and helps develop more accurate plans. This process is collected in the procurement management plan, which includes requirement documents, risk register, activity resource requirements, project schedule, activity cost estimates and more.

To guide these decisions there are tools and techniques, such as make-or-buy analysis, which helps to determine if the activity needs an external supplier or can be done in-house. Seeking help from experts, doing market research and meeting with stakeholders also helps guide this decision.

2. Conduct Procurements

After finishing the paperwork of the first phase, the conduct procurement phase is when you study the bids that come back and determine which one to accept. Before deciding, however, there should be a criterion in place to decide which bid is best for the project and fits your logistics management . The agreements are then signed and the project management plan is updated.

Decide the winner by conferencing with the bidders, having techniques for evaluating the proposals and having independent estimates to make sure the bids are within the range of normal. It doesn’t hurt to seek the advice of experts in the areas you’re contracting to get their perspectives.

There are also analytical techniques you can apply. Advertising is a good way to make sure you’re casting the widest net possible, so you can decide based on all potential bidders. Then procurement negotiations are needed to tweak the final contracts to meet your needs and the contractor. You should use a purchase order to document the price, quantity, delivery window and terms of payment of the goods/services you order. It’s a legally binding document that ensures that you and your vendor are on the same page. Our purchase order template can help you create one that fits your project.

3. Control Procurements

Once the contracts are signed, the management of those contractors must be folded into the overall management responsibilities. Contractors can hurt budgets and schedules, which can lead to a project going off-track or worse.

Therefore, regular status updates are necessary to review contractor agreements, get progress updates and review work performance to make sure that the contractors are meeting the requirements outlined in their contracts. Though you hire contractors because they’re experts in what they do, you still need to monitor and track their work to make sure it’s proceeding as planned.

It’s best to contract a change control system and have regular procurement performance reviews, including inspections and audits to make sure the work is going right. Performance reporting helps keep managers informed, too. A payment system needs to be in place as well as a claims administration and a records management system. Work orders must include all the details about the work being performed by contractors to facilitate performance monitoring.

Change log template

4. Close Procurements

Just as there’s a process to start the procurement, there needs one in place to finalize it. What constitutes completed work should be detailed in the initial agreement with the contractor so there’s no confusion on either’s part as to when the work is done.

Insurance and bonding also usually require a formal release of liability. This makes sure that there are no outstanding changes related to the value and completion date of the contract.

Procurement audits help with this process, as well as having structured procurement negotiations. A records management system will also be needed to manage all the paperwork that will be involved with this stage of the procurement process.

One important part of getting the right materials for your project is having a clear and effective way to order them. This free purchase order template for Excel can streamline the process of creating an effective purchase order pipeline. Plus, it provides a paper trail in case any legal issues arise. Download it now to make the procurement process that much easier and faster.

Free purchase order template for Excel

What Is the Project Manager’s Role in Procurement?

The project manager is involved with procurement, the same as any other aspect they control in the project management process. However, this is a process they might not own with the same authority as other parts of the project.

While the project manager does have the authority to make agreements with contractors on behalf of the company, the project manager is often not the person who administers that contract once in place. Regardless, the project manager must be in the loop.

That means knowing the six processes within the project procurement management knowledge areas outlined in the Project Management Body of Knowledge (PMBOK). The first is the plan purchases and acquisitions, meaning determining what external resources are needed for the project. The project manager has control over this, as they’re more knowledgeable about overall project needs.

Plan contracting is the creation of requirements for whatever products or services are needed, including what companies offer these products or services. They request seller responses by narrowing down the companies to a handful and then selecting the sellers, which is usually the purvey of the purchasing department.

Contract administration is the management of the contract with the vendor. The project manager works daily with the vendor’s account manager. When the contract is fulfilled, there is contract closure. This is usually handled by the purchasing department.

How ProjectManager Can Help with Procurement

Like any part of a project, having the right tools can make project management procurement more effective. ProjectManager offers an online Gantt chart that allows you to plan the contract of your procurements, noting when they start and when they’re planned to end. Status updates are instantly reflected, and you can track the progress of your contractors to make sure the project remains on schedule. The Gantt chart can also help with scheduling materials if they need to come on board at a certain time in the project.

ProjectManager's Gantt chart

Because ProjectManager is online, all status updates, including procurement payments, instantly reflect on the real-time dashboard. The real-time dashboard then takes those numbers and crunches that data, which is delivered in easy-to-read graphs and charts. Now you can see if the project is on track and manage whatever procurement has been made.

ProjectManager's dashboard that shows six key project metrics

Related Content

  • Purchase Management: A How-To Guide With Best Practices
  • Inventory Template for Excel (Free Download)
  • Purchase Order Template for Excel (Free Download)
  • How to Make a Procurement Management Plan

ProjectManager is online project management software that has online Gantt charts to help with scheduling and a real-time dashboard that gives you an up-to-date picture of the project’s progress. Managing project procurement has never been simpler. Try it for yourself by taking a free 30-day trial.

Click here to browse ProjectManager's free templates

Deliver your projects on time and on budget

Start planning your projects.

case study project procurement management

How Hellenic Bank Transformed Its Indirect Procurement Operations With GEP Software

Case studies.

Read our case studies to see how our clients, including hundreds of Fortune 500 and Global 2000 enterprises, leveraged our supply chain and procurement technology solutions and strategies to overcome significant challenges.

These stories offer an in-depth view of our client engagements and explain exactly how we secured excellent outcomes.

Global Fresh Foods Company Saves Millions Through Supply Chain Transformation in Partnership With GEP

Consumer Packaged Goods

Global fresh foods company saves millions through supply chain transformation in partnership with gep.

case study project procurement management

Banking & Financial Services

Global Manufacturer Boosts Compliance and Reduces Maverick Spend With GEP SMART

Industrial Manufacturing

Global manufacturer boosts compliance and reduces maverick spend with gep smart.

Leading Utility Mitigates Supply Risk and Reduces Costs With GEP

Energy & Utilities

Leading utility mitigates supply risk and reduces costs with gep.

GEP Helps Fortune 500 Tech Company Optimize Inventory, Free Up $1 Billion in Working Capital

GEP Helps Fortune 500 Tech Company Optimize Inventory, Free Up $1 Billion in Working Capital

Large Oil & Gas Company Transforms Procurement Operations With GEP SMART

Oil & Gas

Large oil & gas company transforms procurement operations with gep smart.

How a Global Fast-Food Chain Saved $22M on a Key Raw Material Category With GEP

How a Global Fast-Food Chain Saved $22M on a Key Raw Material Category With GEP

Leading Telecom Company Saves $25 Million Through eAuctions by Partnering With GEP

Leading Telecom Company Saves $25 Million Through eAuctions by Partnering With GEP

Global Fast-Food Chain Develops Supply Risk Mitigation Strategy With GEP

Global Fast-Food Chain Develops Supply Risk Mitigation Strategy With GEP

Key insights.

Procurement and supply chain leaders worldwide look to GEP for process, technology and industry expertise, and we are happy to share our learnings from years of complex problem solving. The GEP Knowledge Bank encompasses proprietary research, issue-orientated white papers and webinars, case studies, and playbooks and primers.

  • Category Management (168)
  • Supply Chain (297)
  • Source to Pay (479)
  • Finance (4)
  • Procure to Pay (97)
  • Procurement Strategy (390)
  • Sourcing (211)
  • Spend Management (124)
  • Procurement Technology (314)
  • Procurement Transformation (181)
  • Supplier Management (109)

Send us your question(s)

Request for a business proposal

Share your thoughts, comments and suggestions

Schedule a live demo of our software

We are a global management consultancy that delivers exceptional outcomes and sustainable change

Consultancy Offices

North america, united states of america, south america, south america (regional hub), switzerland, uk (oxford), middle east, middle east (regional hub), southern africa, mauritius (corporate), singapore (cecil street), singapore (marina bay), philippines, our expertise.

  • Financial Services
  • FMCG & Retail

Manufacturing

  • Oil, Gas & Petrochemicals
  • Construction & Property Development
  • Telecommunications
  • Transportation & Logistics
  • Business Transformation
  • Data & Analytics
  • Digital Transformation

Sustainability and Climate Change (ESG)

Operational Excellence

  • Organisational Effectiveness
  • Revenue Growth
  • Renoir Consulting
  • Unison Mining Consulting

Case Studies

Better sourcing and procurement for cost savings: Case study

August 16, 2023 | operational excellence, related services.

Business Process Re-engineering

Supply Chain Management

Related Industry

Share this article.

At a Glance

As a result of a 20-week project with Renoir, a client in steel manufacturing achieved the following:

  • 15% increase in vendor visitations
  • 15% increase in active scrap suppliers
  • 19.1% increase in alternative grade tonnage
  • 0.8% reduction in scrap cost

Our client is a leading steel manufacturing company headquartered in Southeast Asia. They operate production plants in 3 locations in the region and are a subsidiary of one of the world’s largest steelmakers.

As part of the company’s ongoing efforts to improve performance and profitability, the client engaged Renoir to jointly execute a Procurement Excellence Project which would focus on reducing input costs.

The Challenge

Renoir conducted a 2-week analysis of the client’s current situation. Sourcing practices, the management system employed, and spend categorisations were examined in detail. The findings included:

SCRAP SECTION

  • Current scrap sourcing practices left many potential sources untapped.
  • The use of alternative grades in processing was not maximised.
  • A perceived lack of local availability led to increased import volumes.
  • The client and Renoir agreed that a potential 0.5% to 1% reduction in scrap costs was possible.

NON-METALLIC SECTION

  • Current practices in Non-Metallic Sourcing did not maximise leverage opportunities.
  • The approach to procurement tended towards passive and was predominantly driven by the production facility demands.
  • Spending was often decentralised and made on the spot as opposed to being based on contracts or price agreements.
  • The client and Renoir agreed that a potential 3 to 5% reduction in Non-Metallic costs was achievable.

How OEE can help improve your manufacturing operations

Lean philosophy: when less brings more value, what we did.

Structured over 20 weeks, this program was designed to make a significant impact on both spend areas in short space of time. In alignment with Renoir’s methodology, two Management Action Teams (MATs) were established comprising executives within the client’s teams, and were given the responsibility to review their practices, define and develop changes, and implement them. 

The MATs were chaired by the client’s Vice President of Procurement and reported fortnightly to a Steering Committee. Teams were supported by full-time Renoir Consultants and a Task Force, working together toward the objective of lowering the input costs.

Key Results

“We have seen the changes made to the way we work and to our team. The intention was to do better and we appreciate the knowledge from Renoir in sharing these ideas with us. Over the 20 weeks, Renoir blended in well with our team and worked together to achieve what they promised.”

– President and CEO

Upon completion of the engagement, there was a noticeable difference in the organisation. Departments worked in unison to achieve common goals and it was apparent that with the implemented new way of working, future procurement for both Sections is now carried out in a more structured methodological way. 

Identify opportunities for operational effectiveness and profitability.

Popular Reads

Ifrs s2: the framework transforming financial institutions for climate challenge, why you should hire change management experts, refinery improves maintenance efficiency, drives us$36.48m business growth, how a company gained a 40% increase in labour productivity, people, process, profit: auto parts manufacturer achieves 4:1 roi through operational excellence, better hospital inventory management cuts stock needs by 36%, further reading, connect with us.

Let us work with you to achieve exceptional results.

Subscribe to our newsletter

Stay updated with the latest trends and insights relevant to your industry.

About Us | Industries | Services | Insights | News | Contact Us | Careers

Copyright© 2024 Renoir Consulting Limited

Data protection policy, gdpr cookie policy.

Automated page speed optimizations for fast site performance

National Academies Press: OpenBook

Vehicle Operator Recruitment, Retention, and Performance in ADA Complementary Paratransit Operations (2010)

Chapter: chapter 10 - case studies of procurement and contracting best practices.

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

108 It has been estimated that between 70% and 90% of ADA paratransit programs use one or more contracted operators. Some systems also use contractors to perform reservations and scheduling and sometimes the dispatch function as well; depending on the contractual arrangements and relation- ships, these can be part of a turn-key operation contract or could be a contract for call center management or brokerage management services, with separate contracts for operations. Because the use of contractors for ADA paratransit is so pre- dominant, the ways in which contractors are procured bears examination relative to their impact on the recruitment and retention of operators. Some transit agencies include in their procurement docu- ments (RFP, sample contract) terms and/or requirements that result in effective operator recruitment and a low turnover rate. For example, some transit agencies have developed procure- ment documents that specify a minimum vehicle operator wage rate or “livable wage rate” or even a “competitive wage rate.” Moreover, some transit agencies have asked in their RFP for proposers to provide detailed information about wage rates and the fringe benefits that are available to operators. These agencies have discovered that it is not sufficient to question whether or not a proposer offers health care coverage to its employees, which only tells half the story; a follow-up and more illuminating question asks for the percentage of health care premiums that the employee must contribute. For exam- ple, if the percentage contribution is unrealistically high for an employee, health insurance effectively becomes unattainable. Other transit agencies in their procurement documents have emphasized the importance of operator recruitment and the retention of a stable work force in a more circuitous manner by (1) including evaluation criteria and/or bonuses paid to the contractor for achieving a certain level of operator retention and/or (2) requiring or providing bonuses for 100% pull-out coverage. By including such terms, these transit agencies are working to discourage the submission of proposals that include low operator wages, which are too often a casualty of the compet- itive bidding process. The goal is to generate competitive cost proposals that also accurately reflect competitive vehicle oper- ator wage rates and fringe benefits and result in a more stable vehicle operator workforce. The objective of this portion of the research was to collect best practice examples of procurement documents that directly or indirectly resulted in a fair vehicle operator compensation pack- age and to determine how positively those strategies effected operator recruitment and retention. Approach and Methodology The first step in the research was to identify transit systems who indicated in the national survey that they crafted their pro- curement documents to contain one or more of the following provisions: • Statements that a stable, experienced operator workforce was expected, along with evaluation criteria that put more weight on proposals that include effective vehicle operator recruitment and retention efforts or which otherwise evi- dence how this is to be achieved. • Requirements to provide detailed information about spe- cific operator recruitment and retention activities and the associated level of effort and cost specific to each effort. • Requirements for a minimum operator wage rate or “living wage” or favorable or competitive operator wages rates, along with additional requirements to provide details of the operator wage rates, including training wage rates, starting wage rates, and maximum wage rates per vehicle type if appropriate for each year of the contract. • Requirements to provide detailed cost information or assumptions about the levels of fringe benefits provided and the required employee percentage of contributions for health care insurance for each category of employee (single, married, family, etc.). C H A P T E R 1 0 Case Studies of Procurement and Contracting Best Practices

• Requirements to provide total and average operator wages and fringe, and the assumptions upon which that total cost is based, e.g., number of full-time and part-time operators, average shift lengths, total service hours by operator type and how that was calculated, and total operator pay hours by operator type and how that was calculated. • Requirements to achieve certain standards for operator retainage (or turnover) and/or to maintain a sufficient oper- ator work force or surrogate measure, such as achieving a certain standard for pull-out coverage; as part of this requirement, the specification of bonus payments for achiev- ing these standards or penalties for not achieving these standards. Among the respondents to the national survey, 26 public transit/paratransit agencies indicated that they included such language in their RFPs and contracts, and 14 of these 26 agen- cies indicated that they had had moderate or good success as a result. These 14 systems and the success indicated are shown in Table 10-1. The following summarizes those results: • Eleven agencies reported moderate or good success with conveying that a stable and experienced work force was expected. Of these, ten stated that this was mentioned in the RFP, and seven stated that they included this as an eval- uation criterion in rating the proposals. • Seven agencies indicated moderate or good success with the inclusion of a living or minimum wage standard. • Nine agencies indicated moderate or good success with incentives and penalties related to maintaining an adequate workforce and/or covering runs. Follow-up contact was made with these 14 agencies to obtain more detailed information. Follow-up contact focused on the following: • Determining whether any measurable improvements to service could be traced to the procurement/contractual provisions; • Obtaining procurement/contract documents to get the exact language used (or point systems used in the case of evaluation criteria); and • Discussing their perspectives and experiences with these strategies. An attempt was made to also interview one contractor from each system to get a contractor perspective on the pro- curement process or contract provisions. Thirteen of the 14 agencies responded, and detailed infor- mation was gathered from 12 of these systems. The research team was able to obtain a contractor perspective for 11 of the 12 systems contacted. Information from 11 of the systems contacted is included in the mini case studies below. Lessons Learned The data obtained in this study provided a strong and com- pelling case for the positive effect that certain ADA paratransit contractor procurement and contract provisions have on oper- ator recruitment and retention of the paratransit contractors. The following are lessons learned: • Transit agencies that included clear expectations of a stable, experienced operator workforce in their RFPs often did report lower rates of operator turnover. The language in the RFPs did appear to encourage potential bidders to improve compensation and focus more on efforts to maintain a sta- ble operator workforce. In most cases, performance penal- ties did not have to be imposed because compliance with goals and contract provisions was achieved. • Operator compensation stands out as the key determining factor of operator recruitment and retention. Even in areas without a municipal living wage ordinance, it was found that contractors who paid more per hour than lower-paying companies tended to see a reduction in turnover. Other efforts, implemented along with wage increases were also reported to achieve lower turnover. • Contractors who were able to evidence in their proposals a successful track record of operator retention in their pro- posals claim to encounter minimal challenges in securing contracts and in implementing new contracts. At the same time, those agencies that did not include such expectation or requirement in their RFPs claim to value this experience when selecting a bidder. • The comparative importance of cost versus service quality varied somewhat amongst transit agencies as an evaluation criterion, though it is important to note that the agencies valuing service quality over cost consistently reported high satisfaction with their operating contractor(s). For many procurements, the evaluation process is conducted in two independent phases: first a technical evaluation and then a price evaluation; and in at least one case, the two phases were undertaken by two different evaluation committees. • Decreases in operator turnover rates and increases in ser- vice productivity were reported by agencies that selected contractors which evidenced competitive compensation packages and a commitment to maintaining a well-trained, experienced operator workforce. One agency was able to more than double its number of service hours provided as a result of the contractors’ ability to maintain operators who were capable of meeting an increased level of service demand. Whether expressed in evaluation criteria or contractual requirements, it is evident from the research that transit agen- cies that recognize the benefits of using contractors that can 109

City Transit Agency Living or Minimum Wage Standard in RFP Incentives and/or Penalties for Maintaining Adequate Workforce or Covering Runs Mentioned in RFP Evaluation Criteria Columbus, OH COTA Moderate Moderate Moderate Good Dallas, TX DART Moderate Moderate Good Denver, CO RTD access-a-Ride Good Good Good Good Everett, WA Community Transit Kalamazoo, MI Kalamazoo Metro Transit Good Good Los Angeles, CA Access Services Madison, WI Madison Metro Transit Moderate Good Good Nashville, TN Nashville MTA Moderate Moderate Moderate Orange County, CA OCTA Good Good Good Lake Worth, FL Palm Tran Good Moderate Phoenix, AZ Phoenix Public Transit Moderate Moderate Moderate Moderate Moderate Moderate San Diego, CA San Diego MTS Moderate Moderate San Mateo County, CA Redi-Wheels Good Seattle/King County, WA Access Transportation "Stable, Experienced Workforce" Table 10-1. TCRP project F-13 survey respondents indicating moderate or good success with operator recruitment/retainage as a result of procurement/contractual provisions.

attract and maintain a stable, experienced operator workforce attract contractors who either share this recognition or who modify their practices to achieve this goal. The following case studies summarize the approaches taken by 11 selected systems that were studied. Outcomes and expe- riences, as well as a contractor perspective on the changes, are provided. Case Studies Dallas Area Rapid Transit (DART), Dallas, TX DART is the regional transit authority serving the Dallas metropolitan area, including the city of Dallas and 12 sur- rounding cities. DART has approximately 130 bus routes, 45 miles of light rail transit (DART Rail), 75 freeway miles of high occupancy vehicle (HOV) lanes, and an ADA paratran- sit service. DART and the Fort Worth Transportation Author- ity (the T) jointly operate 35 miles of commuter rail transit (the Trinity Railway Express or TRE), linking downtown Dallas and Fort Worth with stops in the mid-cities and DFW Inter- national Airport. Use of Contractors for ADA Paratransit DART’s ADA paratransit service, called Paratransit, is organized as follows: DART staffs a call center that includes the reservations, scheduling and dispatch function for the entire system. DART also provides staff for contract admin- istration, eligibility certification, and customer service func- tions. Veolia Transportation, under contract to DART, oper- ates the service with a fleet of 186 vehicles supplied by DART. The contract payment structure includes a monthly fixed amount to cover fixed costs, a variable hourly rate for opera- tions, plus reimbursement for tolls. Procurement/Contractual Provisions In the survey, DART reported that it had moderate success with specifying a minimum wage rate in its procurement and contract documents and significant success with liquidated damages for uncovered runs. With respect to the minimum wage requirement, DART staff stated the following: We make it clear that we expect experienced, trained opera- tors; by setting the bar high, we have a better chance securing such a workforce through the contract. As a rule, happy people make contented workers. A contented workforce makes good decisions and they are reliable. Requiring the contractor to pro- vide a minimum or living wage helps to ensure a more contented workforce. Left to themselves, contractors will try to keep wages as low as possible. This low rate will eventually cause personnel to leave. The turnover rate increases and valuable experience and skills are diluted or lost. In DART’s solicitation, the two provisions related to the workforce were the following: Operators Minimum Wage Rates and Incentive Programs All persons employed as operators for performance of this con- tract or any subcontract hereunder shall be paid not less than $10.00 per hour while in training. The minimum wage standard imposed is a minimum and the Contractor is required to employ a systematic evaluation program and benefit package designed to encourage retention of well qualified and good performing oper- ators for the duration of the contract. Toward this end, the Con- tractor shall establish progressive wage increases beyond the train- ing level and offer such increases to employees who successfully graduate from the training program. Operators and mechanics shall also be provided a minimum of three (3) sick days as part of the benefit program. Failure to comply with this provision shall constitute noncompliance with the terms of this contract. Schedule of Liquidated Damages for Uncovered Runs Liquidated damages in the amount of $350 per occurrence shall be assessed for unavailability of operators or vehicles at Contractor scheduled operator report/clock-in time. The Contractor Perspective The Regional Manager for Veolia Transportation and for- mer General Manager for this contract felt that the minimum wage rate/sick day provision has contributed more signifi- cantly to operator retainage than the uncovered run provision. He reported that competitive wage rates and benefits attract a “higher-quality” job applicant which results in less voluntary attrition, whereas the liquidated damages for uncovered runs are more to ensure that operators depart on time. Reported Results The Regional manager reported that voluntary operator attrition totals no more than five or less operators per year since the RFP/contractual provision for minimum wage and sick day benefits was instituted. Denver Regional Transportation District (RTD), Denver, CO The Regional Transportation District (RTD) is the regional transportation agency for the Denver metropolitan area. The RTD has 140 local, express, and regional bus routes and six light rail lines that provide 35 miles of light rail service. The RTD also has three demand-response services: (1) call-n- Ride, a general public dial-a-ride in several neighborhoods that cannot sustain fixed-route bus service; (2) access-a-Ride, its ADA paratransit services; and (3) access-a-Cab, a supple- mental (non-ADA) taxi subsidy program that is available to access-a-Ride customers. 111

Use of Contractors for ADA Paratransit RTD’s ADA paratransit service is organized as follows: RTD contracts with First Transit to operate its paratransit call center. As part of this contract, First Transit provides reser- vations, scheduling, and dispatching services for access-a- Ride, and reservations for access-a-Cab. RTD has separate contracts with four different carriers to operate access-a-Ride services in Denver: Global Transportation, MV Transporta- tion, Special Transit, and Coach USA. Special Transit is also contracted for service in Boulder, CO. The call center con- tractor develops the daily schedules and transmits daily run manifests to each of the contractors. Procurement/Contractual Provisions In the survey, RTD reported that it had had significant suc- cess with (1) specific evaluation criteria for a stable experi- enced workforce; (2) requiring proposers to provide wage scales, and (3) specifying liquidated damages for uncovered runs. With respect to these strategies, the RTD access-a-Ride service manager attached the following note: Points are assigned via the evaluation process for a range of issues such as understanding and approach to the RFP, firm and staff experience and costs. While we do not mandate specific wages, we do identify current wage scales. Liquidated damages and incentives are designed to motivate contractors to perform within acceptable service standards. The relevant provisions in RTD’s paratransit RFP are: • Proposal Evaluation Criteria for Wage Rates. Proposers who state that they will maintain (or increase) the current wage scales are given points accordingly. Proposers who state that their wage scales are below the current ones are marked down. The purpose of this is to maintain a consis- tency in the wage scale from one contract to the next. RTD views this evaluation criterion as a significant contributor to this goal, which in turn has contributed to low operator attrition rates. • Contract incentives and/or penalties related to maintain- ing an adequate vehicle operator workforce or covering all runs assigned. As a contract provision, RTD assesses a $500 fine for each uncovered run, whether it is a result of not enough operators and/or not enough vehicles. On days when there are an unexpected and large number of operator call-outs, a carrier may not be able to cover all of the runs. In this circumstance, RTD allows a carrier to re-distribute trips from light runs to other runs where these trips might fit. However, in some cases, this may not be possible, and the carrier has no other choice but to give back the run. In this case, a $500 fine is assessed per “give-back.” This provision is thus an inducement for a carrier to size an extra board correctly and for the carrier to have a back-up plan for call- ing in operators willing to work overtime. The Contractor Perspective The Executive Director of Special Transit had a slightly dif- ferent take on the provisions in the RTD’s procurement/ contractual document, indicating that the provisions had per- haps less significant impact on vehicle operator recruitment in actual practice but also acknowledging that the liquidated damages for uncovered runs did provide an impetus for Spe- cial Transit’s maintaining a sufficient roster of operators. She stated that the challenge for Special Transit is to balance the potential for liquidated damages against the cost of having excess operators, since the Call Center contractor (First Tran- sit) can cut runs at any time. She added that RTD’s practice of providing transit passes to contractor operators (at no cost to the operators) had a positive impact on Special Transit’s ability to recruit and retain operators. Reported Results Special Transit reported an annualized operator turnover rate of about 35% for its access-a-Ride service in Denver. Interestingly, the Executive Director also reports a 0% turn- over rate for its access-a-Ride operators in Boulder. She attributed this dramatic difference to the fact that the Denver operators are unionized, and the Boulder operators are not (Special Transit inherited a union shop when it took over the entire regional service in 2000 on an emergency basis for RTD). She further explained that the seniority-based shift- bid process (which is required by the union agreement) results in the newer operators getting the worst shifts (nights, week- ends, etc.), and that the operator turnover in Denver is most acute among the newer operators. In contrast, Special Tran- sit has more flexibility in matching individual operators’ needs with shift requirements in the Boulder operation. Attrition Rate. RTD reported that its contractors have experienced operator attrition rates ranging from 20% to 35%. Run Coverage. RTD indicated that since the run coverage provision was instituted, the average number of “give-backs” have been reduced from 5 per week to perhaps 1 per month. Community Transit, Everett, WA Community Transit is a special-purpose municipal corpo- ration providing public transportation services in Snohomish County, WA. Community Transit’s services include fixed-route transit, vanpool, ride-matching, and paratransit (DART). In 2004, over 8 million passenger trips were made on the system, and Community Transit carried 57% of all Snohomish County- 112

Seattle commuters to work and back. The entire bus fleet is wheelchair accessible, either by low-floor ramped vehicles or buses equipped with wheelchair lifts. Dial-a-Ride Transportation (DART) is Community Transit’s ADA paratransit service. With an existing fleet of 53 vehicles, the service operates 7 days a week, covers 1,400 square miles, and provides an average of 800 one-way trips per weekday. Use of Contractors for ADA Paratransit DART service is operated by Senior Services of Snohomish County (SSSC), a private non-profit organization, through a contract with Community Transit since 1981. Although the contractor manages all day-to-day operations, the hardware and software, including an automated client file, reservation, mapping, scheduling, and dispatch system, is provided by Community Transit. Vehicles are also provided by Commu- nity Transit, but maintenance is provided by the contractor. SSSC manages the day-to-day operations of the service. The organization’s responsibilities include customer eligibility screening, customer service, scheduling, reservations, routing, dispatching, supervision, fare collection, and operations. Procurement/Contractual Provisions Community Transit places a high value on service quality when selecting contractors, recognizing operator pay as an indicator of that quality. The agency’s Contracted Services Coordinator stated the following: We make it clear in our RFPs that we expect experienced, trained operators; by setting the bar high, we have a better chance of securing such a workforce through the contract. While the expectation of paying operators well and valuing employment longevity is not explicitly indicated in the RFPs, it acts as a strong determinant in selecting winning proposals. For example, Community Transit’s most recent contractor was chosen largely because its proposal touted high wages for operators and extremely low turnover. Community Transit’s RFPs also include a detailed set of serv- ice standards, incentives, and liquidated damages, although Community Transit reported that the incentives do not have a significant impact on service. One of the liquidated dam- ages provisions relates to run coverage. The following is an example: Contract incentives and/or penalties related to maintaining an adequate vehicle operator workforce or covering all runs assigned The Contractor shall provide adequate staffing to ensure that staff or manpower shortages are compensated for with qualified personnel in a manner which does not detract from staffing lev- els in other areas of this project. The RFP includes the following language regarding penal- ties for poor performance by the Contractor: One hundred dollars ($100.00) for each occasion that the Contractor does not have the number of vehicles available for revenue service as specified by Community Transit in operating service. The Contractor Perspective The General Manager of Senior Services of Snohomish County stated that the high expectations for experienced operators and high wages are “definitely a draw” when recruit- ing operators. He explained that before hiring operators, they go through intensive training, and 60% “make it out.” The agency looks for vehicle operators that have the following: “good driving records, good people skills, and want to assist people. Those are the ones that stick around a long time.” The agency reported the turnover rate for operators is about 20–30%, depending on the month. The General Manager reported that Senior Services meets the goals set forth by Community Transit. The 91% on-time performance standards are always met, and the general man- ager stated that they “never miss a trip.” He explained: “We meet all goals. We don’t turn anybody down. We really don’t have financial disincentives happen.” Although he is aware that the financial disincentives exist in the contract, the main motivation for Senior Services is to be a good service provider. Reported Results Turnover has not been a problem for Community Transit since they began contracting with Senior Services of Sno- homish County, the contractor who proposed to provide high operator wage rates and to maximize operator retention to the extent possible. It was noted that Senior Services only loses one or two operators a month out of about 70 operators. Community Transit believes that the combination of RFP language requiring a stable, experienced operator workforce and the contractor’s natural desire to treat operators well and provide them with sufficient training has contributed to a paratransit system that provides high quality, on-time ser- vice, and satisfied and experienced operators. Access Services, Inc. (ASI), Los Angeles, CA Access Services (ASI) is a local public agency organized as a public benefit corporation that operates ADA complemen- tary paratransit service. ADA paratransit service is provided for the Los Angeles County Metropolitan Transit Authority (LACMTA) and 40 other fixed-route transit operators in Los Angeles County pursuant to the Los Angeles County Coordi- nated Paratransit Plan. In addition to operating the ADA 113

complementary paratransit service, known as Access Para- transit, ASI acts as the Los Angeles County Consolidated Transportation Service Agency (CTSA). It is governed by a nine-member board appointed by the Los Angeles County municipal fixed-route operators, the Los Angeles County local fixed-route operators, the City of Los Angeles, the County of Los Angeles, the Transportation Corridor Representatives of the Los Angeles branch of the League of Cities, the Los Angeles County Commission on Disabilities, and the Coalition of Independent Living Centers. Use of Contractors for ADA Paratransit Service is provided by six principal contractors in six regions as shown in Table 10-2. Requests for service are auto- matically routed to the appropriate carrier based on the cus- tomer’s telephone number. Each of the contractors provides turn-key services in their region. Each provider except for MVT in the Southern region is responsible for taking reservations, verifying customer eli- gibility, scheduling rides onto vehicles, and providing service using ASI-certified vehicles and operators. GPI accepts all reservations for the West/Central and Southern regions and passes on a portion of the reservations for the Southern region to MVT. Each provider is responsible for all trips originating in its region regardless of whether the destination is in the region or another one within the Los Angeles Basin. Trips between the Basin, Santa Clarita, and the Antelope Valley require a transfer. Service is provided using a mix of ASI-owned vehicles, provider-owned vehicles dedicated to Access service, and taxi- cabs certified for Access Paratransit service. ASI manages the system, providing contractor oversight and monitoring, and also directly provides customer service functions, fleet management functions (for its own vehicles), community outreach functions, and all administrative and planning functions. Procurement/Contractual Provisions Access Services reported in the survey that it had moderate success with the inclusion of “living wage” and benefit infor- mation in the RFP. Evaluation criteria are used to evaluate proposals, and points are earned on a sliding scale. Criteria are based on the following: • Comparability of pay (to other carriers); • Quality of the heath care plan (e.g., the percentage split of premiums between the company and the operator); • Inclusion of medical, dental and vision benefits versus medical only • Family package; • Number of vacation, sick and PTO days; • Educational reimbursement; and • 401K/retirement plan. In its paratransit solicitations, Access Services supplies wage information by position for the current contractor; this includes the starting hourly rate, the top hourly rate, and any qualifying notes, such as whether there are annual or merit increases. The two most relevant provisions in the solicitations are as follows: Expectations for Operator Wages / Retention The selected Proposed shall establish and maintain an employee pay and benefit structure, which will serve to attract and retain high-quality employees for all positions required to successfully perform the work. Proposer must submit rates and graduated rate increases along with timelines for the increases. Proposal Evaluation Criteria Access Services will substantially downgrade proposals that do not incorporate appropriate wage and benefit packages that will facilitate successful recruitment and retention of qualified employees. Access Services will also downgrade proposals that do not provide for reasonable medical benefits for all full time employees. Proposer should carefully consider adequate and comparable rates of compensation, public sector and private sec- tor, which exist for similar positions within Los Angeles County. Proposals are evaluated with both qualitative and quanti- tative measures. The quantitative measures are as follows: Quality of Technical Approach 30% Paratransit Operating Experience 20% Cost/Price Proposal 20% Employee Pay and Benefits 15% Qualifications and Availability of Proposed Staff 15% 114 Region Contact Providers San Fernando Valley (Northern) MV Transportation (MVT) Eastern San Gabriel Transit (SGT) West/Central Global Paratransit Inc. (GPI) Southern Global Paratransit Inc., and MV Transportation Santa Clarita Santa Clarita Transit Authority Antelope Valley Antelope Valley Transit Authority (AVTA) Table 10-2. ASI service regions and contractors.

The Contractor Perspective MV Transportation’s General Manager reported that wage scales have had a positive impact on vehicle operator retention, but he said that because of the competitiveness of the procure- ment process, the company is unable to increase hourly wages. However, operator retention is encouraged through increasing wage scales at 6 month and yearly increments. In addition, the company offers incentive programs for retention, such as a financial retention bonus, paid at multiple stages up to an operator’s first 6 months of work. He also reported that the company’s employee referral program has been extremely successful. If an operator refers a new applicant, and if the new hire works for at least 90 days, both receive bonuses. The general manager said that this program also “encourages the experienced operators to be mentors for the new hire referrals.” Despite retention programs, there is about a 45% turnover rate. As far as the evaluation criteria, the general manager sug- gested that “it is a good concept, although the current con- tract was renegotiated due to the current budget crisis.” Reported Results ASI’s Executive Director noted that ASI purposely did not quote a minimum wage rate in their RFP because in Califor- nia, that would constitute ASI being an “implied” employer. However, in the past, ASI has encouraged contractors to set a vehicle operator wage above the minimum ($8.50), but in many cases, the wages came in at the figure. She said that ASI is exploring how to actually set the wage without becoming the implied employer of the operators. The Executive Director also was quick to point out though that operator wage rates alone do not tell the entire story, reporting that the contractor with highest operator wage rates in the system was one of the poorest performers, and the con- tractor with the lowest wage rates was one of their best per- formers. In the survey, ASI noted that many contractors are still focused on submitting the “lowest bid” since operator wages make up the majority of the overall cost. She also men- tioned that some of her contractors include a benefits pack- age that provides English-as-a-second-language benefits, an operator recognition program, and “stepping stone” career programs and internships that pave the way for operators to advance to senior/management positions. Madison Metro Transit, Madison, WI Madison Metro Transit is the municipal transit provider for the city of Madison, WI, covering an area of 60 square miles. With more than 450 full-time employees, Madison Metro Transit serves an average of over 54,000 daily passenger trips during the school year. The service has 56 fixed-routes and operates a fleet of 204 buses. Its ADA paratransit service, Metro Plus, provides nearly 300,000 annual trips to 1,774 clients. Metro also operates Group Access Service (GAS) for Madison, Middleton, and Monona adults who live in their own homes and apartments, are over 60 years old, and have a physical or sensory disability. GAS is a scheduled, routed, group service to meal sites, farmers’ markets, pharmacies, libraries, and grocery stores. Use of Contractors for ADA Paratransit Beginning in 2009, nearly a quarter of Metro Transit’s paratransit operations are in-house, with the remainder of the work contracted to Transit Solutions, Badger Cab Com- pany, and Badger Bus. All customers call Metro Transit, and transit agency staff either serves the customer themselves or delegates the work to one of the three contractors. Transit Solutions operates about 20% of the ADA service on week- days only, with no weekends or holidays; Badger Bus handles about 30% of the requests on weekdays, nights, and week- ends; and Badger Cab provides ambulatory services and takes over leftover ADA paratransit runs, about 23%. Procurement/Contractual Provisions There is a municipal and county-wide living wage ordi- nance that is articulated in Madison Metro’s RFPs. It states: LIVING WAGE (Applicable to contracts exceeding $5,000). CONTRACTOR agrees to pay all employees employed by CONTRACTOR in the performance of this contract, whether on a full-time or part-time basis, a base wage of not less than CITY minimum hourly wage as required by Section 4.20, Madison General Ordinances. One of the contractors, Transit Solutions, adds to this liv- able wage by providing benefits and an incentive plan that pays operators for safety and attendance. Madison Metro has also established standards in its con- tracts with penalties on a per-trip basis. Since 2006, this sys- tem of collecting performance data from contractors and then generating a percentage of compliance has been used to calculate this per-trip penalty fee: It is the responsibility of CONTRACTOR to make every effort to comply with all service standards established by CITY. CITY has established a service standard of passenger pick up no later than twenty (20) minutes after the scheduled time. For each instance in which a passenger is picked up outside of this service standard, the following reimbursement will be applied: On-Time Performance Reimbursement 94% On-Time 100% of the reimbursement rate 90–93% On-Time 98% of the reimbursement rate Less than 90% On-Time 90% the reimbursement rate 115

While the CITY pays the lesser of the cost of the ride or $3.00 for each “no show” a passenger has when service is provided by the CONTRACTOR on a per trip basis, this cost must be absorbed by the contractor if they are over twenty minutes late. The Contractor Perspective The owner of Transit Solutions commented that the “liv- ing wage” outlined in the contract is “great because it gives people a higher starting wage.” Transit Solutions also has benefits for employees like health insurance, retirement pack- ages, and paid holidays, which all help to maintain a steady workforce. In addition to the incentive plan in the contract, the owner noted that Transit Solutions has an incentive plan for vehicle operators that: “pays people for safety and atten- dance . . . all of those things play into recruitment and reten- tion.” The company uses the financial incentives in the con- tract with Metro Transit in a similar fashion with its other employees. The owner stated, “Overall, I think the system they [Metro Transit] have is reasonable and it works.” Reported Results Contractors are almost always within the 94% to 100% on- time rate. Madison Metro Transit’s Paratransit Program Man- ager reported that rarely, if ever, is the 10% reduction penalty enacted. Contractors work hard to meet the 94% compliance rate and have found that the only time they fall short is dur- ing bad weather (in which case the penalty is waived by the City). In March 2009, Transit Solutions achieved a 98% on- time performance rate. It was noted that paying a living wage has definitely helped to retain vehicle operators. The Paratransit Program Manager said she believes this higher pay has also contributed to higher quality driving and service. She stated, “Operators stay when there is better pay, and they drive better, too.” Vehicle operator turnover at Transit Solutions is extremely low. In 11 years of business, over half of Transit Solutions’ orig- inal operators remain. The owner attributes this to a combi- nation of good wages, benefits, and hands-on management; he and his partner are present and available each day, and they make an effort to treat people well and with respect. They even maintain a special account for employee pay advances which are paid back via paycheck deduction at no interest. The owner stated: “We do things to help our work- ers and make it easier and more enjoyable to work here. And it really works.” Orange County Transportation Authority (OCTA), Orange County, CA The Orange County Transportation Authority (OCTA) serves Orange County through bus, commuter rail, Express Lanes, and paratransit service. OCTA operates approximately 80 bus routes, covering every city in Orange County and sev- eral cities in Los Angeles County. OCTA also operates express service to Los Angeles and to San Bernardino and Riverside counties. OCTA’s ADA paratransit service is called ACCESS. Most recently, in 2007, OCTA initiated a Vanpool Program to provide assistance to commuters who work in Orange County and live in neighboring counties. Use of Contractors for ADA Paratransit Until July 2009, OCTA’s fixed-route, express bus, and ADA paratransit service were operated by Veolia Transporta- tion. After July 2009, Veolia Transportation began running only the ADA paratransit service, ACCESS, utilizing a fleet of 350 vehicles. Veolia provides a turn-key operation, providing all day-to-day operations and vehicle maintenance on OCTA provided vehicles. OCTA has a managerial role and has close oversight on all service provided by Veolia. Procurement/Contractual Provisions In the survey, OCTA reported that it had significant suc- cess with specifying a minimum or “living wage” rate in its procurement and contract documents, as well as including language regarding an experienced workforce and incentives or penalties in the contract related to maintaining an ade- quate vehicle operator workforce. OCTA also reported that they include strict and specific evaluation criteria in the RFP. OCTA includes the following language to indicate its expec- tations for vehicle operator wages/retention: AUTHORITY recognizes the expense and negative effect of employee turnover. Therefore, the CONTRACTOR must demon- strate they have an acceptable recruitment and hiring program that is intended to minimize employee turnover and retain a high quality work force. Several service performance standards, incentive payments, and penalties are also included, as shown in the Table 10-3. The Contractor Perspective The Project Director for Veolia reported a low turnover rate of 7%. He reported that there is a dedicated commitment to training which has paid off, as evidenced by the high retention rate. He said that with better training the company sees better results. He noted that another reason for the high retention is the benefits package provided to employees, including good health care, a living wage, and help with flexibility on travel to work, which is an issue in and around the Los Angeles area. The Project Director reported that the incentives outlined in the scope of work are hard to achieve. He said: “In 36 months, 116

we’ve received only one performance incentive. They are chal- lenging incentives to meet.” He explained that the complaint standard is the toughest and perhaps the strongest in the coun- try, so the company has never met it. Veolia is striving to meet it and is establishing a new program with increased training for better results. Reported Results OCTA’s Field Administrator commented that the contrac- tor performs well according to obligations outlined in the scope of work. He reports that good communication between the contractor and the agency is the best way to have a shared understanding of expectations, since language in a contract can be tricky and interpreted in more than one way. He said that since April 2007, Veolia has maintained an on-time per- formance level average of 93%. Palm Tran CONNECTION, Lake Worth, FL Palm Tran, Palm Beach County’s public transportation service, provides fixed-route public bus transportation and coordinated paratransit service. Fixed-route bus service is provided on over 30 routes, serving nearly all destinations in the county. Buses generally operate weekdays with 30-minute headways during peak rush hours and 60-minute headways during mid-day and on the weekends. Palm Tran CONNECTION is the county’s shared ride, door- to-door transportation specialized service. CONNECTION schedules all trips, prepares vehicle manifests, handles cus- tomer concerns, determines eligibility, and monitors the per- formance of transportation providers. Veolia runs a turn-key operation, performing all ADA paratransit functions. Use of Contractors for ADA Paratransit Palm Tran contracts with MV Transportation, Palm Beach Metro Transportation, and Two Wheels Transportation. The contractors operate 190 vans, providing door-to-door service for senior citizens, persons with disabilities, and persons with low-income. The service provides an average of 4,025 sched- uled passenger trips each weekday. Veolia runs a turn-key operation and performs all ADA paratransit functions. Procurement/Contractual Provisions Palm Tran includes language in RFPs indicating that a stable, experienced vehicle operator workforce is expected. Under- standing that a great deal of operator retention is determined by compensation, Palm Tran gives preference to respondents with the highest operator pay rates. Palm Tran also includes a specific liquidated damage fee in contracts to offset the cost of uncovered runs. While this fee has provided an effective incentive for contractors to cover runs, there have not been many problems, and the fee penalty has been scarcely implemented. The Contractor Perspective The General Manager of MV Transportation believes that factors such as benefits, work atmosphere, and communica- tion are key ingredients in maintaining a stable and experi- enced workforce. MV Transportation takes extra care in mak- ing the company an enjoyable place to work by providing full-benefits, substantial vacation time, and an open door pol- icy with all managers. The general manager reported that the company no longer has to spend significant time and money 117 Category Standard Incentive Penalty ACCESS On Time Performance 95% or above $5,000 for each percentage point above 96% on time $5,000 for each percentage point below 94% on time Service Delivery Failure All qualified requests must be served. None $1,000 per occurrence Call Center Hold Time Average of 90 seconds or less None $1,000 deduction if monthly average exceeds 90 seconds Call Center Valid Complaints No more than 1 valid complaint per 1,000 passengers each month None $100 for each valid complaint over 1 per 1,000 passengers Accident Report Report all within 24 hours, verbal and written. None $5,000 per accident not reported. Table 10-3. OCTA service standards, incentives and penalties.

recruiting employees because the pay is higher than other companies. MV Transportation increased hourly pay for the Palm Tran contract, and the general manager reported that this has helped to retain operators. The general manager also reported that she aims to main- tain a stable operator workforce and works towards adhering to contract requirements. She uses the liquidated damages clauses set forth in contracts as incentives to provide good service. Reported Results Palm Tran CONNECTION’s Fiscal Analyst reported that, generally, contractors perform well and meet their contractual requirements. There are rarely, if ever, any uncovered runs. Turnover has become less of a problem not only because of the RFP provisions, but as unemployment rates have increased, operators tend to hold onto to their jobs for longer periods of time. City of Phoenix Public Transit Department, Phoenix, AZ The City of Phoenix Public Transit Department is responsi- ble for the overall supervision of the City of Phoenix Transit System. The City manages local buses, Phoenix Dial-a-Ride paratransit, Reserve-a-Ride senior service, RAPID and Express commuter services, and several neighborhood circulators. The City’s paratransit service is called Dial-a-Ride. The service operates seven days a week in almost all areas within Phoenix city limits. Dial-A-Ride serves individuals who are ADA paratransit eligible as well as seniors. ADA paratransit customers are encouraged to call at least one day in advance for service; where possible, same day demand service is also available after reservation requests have been scheduled. The City also manages Reserve-a-Ride, a specialized, door- to-door transportation service for senior citizens over 60 years old and certified persons with disabilities. Reserve-a-Ride pro- vides transportation to senior centers, medical appointments, social service agencies, and shopping. The primary responsi- bility of the service is to provide transportation to and from senior centers, and other trip requests are accommodated wher- ever possible. These two services, Dial-a-Ride and Reserve-a- Ride, are operated by the same contractor with the same fleet of vehicles. Use of Contractors for ADA Paratransit MV Transportation has been the City’s paratransit contrac- tor since 2001. MV Transportation manages all day-to-day operations, including maintenance on over 100 vehicles and scheduling service for both advance and same-day service requests. Out of the 300 or so MV Transportation employees, about 215 of them are vehicle operators. Procurement/Contractual Provisions In the survey, Phoenix reported that it had moderate success when specifying that a stable, experienced vehicle operator workforce was expected, and also moderate success when including a “livable wage” requirement in its procurement and contract documents. While there is no living wage ordinance in Phoenix, the City understands that a livable wage scale is sig- nificant for job retention and stability. The City’s RFP requests a detailed plan with specific strate- gies for maintaining a stable workforce. The City encourages proposers to be creative in their approach to operator reten- tion, stating that preference will be given to proposers who can successfully demonstrate to City their ability to retain quality operators. In addition to requiring the proposer to outline hir- ing, training, and retraining programs for operators, Section VII of the RFP asks proposers to respond to the following: Discuss the PROPOSER’S philosophy on providing a “livable wage” given the current state of the economy and how the pro- posed employee wage and benefit package and other innovative programs ensure that they meet that standard. Describe in detail the methods to be taken in order to attract and retain the appropriate staffing levels. Include any incentive and/or merit programs to award outstanding employees. Describe in detail the type and level of employment benefits provided or available to employees addressing vacation, sick and other leaves, health and welfare benefits, wage and salary classi- fications and progressions, and employer contributions for all programs for all job categories. When evaluating RFP responses, a points system is utilized. The Director of Transportation Contract Services explained, “Our approach is that we want to make sure the company we hire is going to fulfill our needs as far as service—we take an approach of service over price.” The evaluation criteria out- lined in the RFP are the following: Qualifications 50 points Professional References 50 points Management 150 points Maintenance and Operations Experience 100 points Understanding of Scope 400 points Price 250 points The RFP also provides a system of incentives and sanctions to reward exemplary performance and ensure adherence to performance standards, but the survey indicated that these incentives and/or penalties did not have even a moderate impact on contractor performance. 118

The Contractor Perspective The General Manager for MV Transportation reported that the success it has had working with the City of Phoenix is due to a “successful, true partnership” between the two organiza- tions. He gave credit for the positive working relationship to the City’s understanding of the operation, saying: “[The Director of Transportation Contract Services] knows how our system works—he understands the nuts and the bolts.” The current average wage for an operator is $14.45, which is adequate according to the terms outlined in the RFP. In addition to a reasonable wage, though, the general manager said it is important to look for individuals who are customer- service oriented. He also indicated that a good work environ- ment and other non-monetary rewards have measurable pos- itive effects on turnover. He noted that these methods were helpful in MV Transportation’s response to the City’s RFP requirement of a description of “methods to be taken in order to attract and retain” employees. Annually, MV Transporta- tion in Phoenix sees about a 21% turnover rate. It was noted that 83 of MV’s 180–200 paratransit vehicle operators have over 8 years of experience. Both the City staff and MV General Manager reported that the financial incentives or penalties were not a motivator to provide good service. MV Transportation does adhere to goals outlined by the City, and they have “monitors all over the place,” indicating current levels of on-time performance, aver- age hold time for a customer on the phone, etc. This keeps all personnel informed of the current situation and helps to strive for the best customer service possible. Regardless of whether the motivation for good service is the contract with the city or just good business practice, MV Transportation receives more financial rewards than penalties. The MV General Manager also commented that RFPs and contracts should be specific: “The more specific the agency can be when putting the proposal together and creating the vision that they want, then the end result will be more successful.” Reported Results The contractor for paratransit service has a relatively low turnover rate for a private contracted operation (reported to be 21%). A third of operators have been employed with the contractor for over 8 years. City of Phoenix transportation staff also reported that “this has improved service and produc- tivity by volumes.” The Director of Transportation Contract Services commented, “It definitely improves productivity and service quality when you treat your employees well.” On the books, the City and contractor have yet to experience a day with high numbers of closed runs. Budgeted hours from the most recent contract indicate that the contractor is always able to meet allotted hours, whereas before contractors in pre- vious periods fell short of the requirements due to lack of oper- ators, which caused the City to over-budget. For the past five or so years, the City has been able to maintain its budget pre- cisely. Important to note, immediately prior to the most recent contract with MV Transportation, the City approved a sales tax measure that allocated more money to transit. In just a 2-year period, the City was able to double its number of service hours provided, and the contractor was able to provide an adequate workforce to meet this new induced demand. According to City staff, the greatest challenge when nego- tiating contracts is trying to convince bidders to change their mindset or approach when developing their proposals. He said that most bidders are accustomed to winning a contract based almost entirely on price rather than service. He noted that in the Phoenix process, when reviewing proposals, the price for each bidder was not revealed to the evaluation com- mittee. As a result, the committee was only able to evaluate based on the merits of the proposals. A City staffer expressed: “I feel that we had a successful procurement in that the suc- cessful proposer is still with us and doing a very good job, which was our objective to have them competing on the qual- ity of service, rather than the price. By the way, the successful proposer was not the lowest bidder.” San Diego Metropolitan Transit System, San Diego, CA San Diego Metropolitan Transit System (MTS) is the public transit agency that provides bus and rail services directly or by contract with public or private operators. MTS manages the scheduling, frequency of service, and hours of operation for its existing services covering approximately 570 miles in and around San Diego. Existing passenger services include 82 bus routes, three trolley lines, and ADA paratransit service that together serve over 3 million residents. ADA paratransit service is called MTS Access. Use of Contractors for ADA Paratransit First Transit is the contractor for MTS Access. The contrac- tor is 100% turn-key and handles all operations functions. Vehicles are owned by MTS. Procurement/Contractual Provisions In the survey, MTS reported that it had moderate success including (1) language that a stable, experienced operator workforce was expected; (2) requirements for proposers to provide wage scales, and (3) specific incentives and/or penal- ties for uncovered runs. RFPs include wage standards, which are set to increase or decrease according to the market, thus creating a level playing 119

field for new bidders which allows operators to keep up with the cost of living and retain employees. New contractors must maintain existing operators at current seniority levels. MTS mandates in its contracts that a certain percentage of each invoice is allocated to operators’ benefits. For example, for fiscal year 2011, the minimum wage is $10.14/hour for train- ing, $10.71/hour after training, and $11.27/hour base wage after a probationary period. The contractor is required to con- tribute 5%, or $2.10, from the base wage towards employee benefits. There is also a requirement that all operators who work more than 20 hours per week should have full medical coverage. MTS provides a 10% preference to contractors who are able to prove in proposals that they are able to retain their operator workforce and who agree to retain their current staff upon contract. The evaluation criteria are as follows: Corporate Capacity/Qualifications 10 points of the Firm Corporate Experience 30 points Key Personnel 50 points Facility Plan 20 points Safety and Training Plan 10 points Start-up Plan 20 points Customer Services 20 points Cost and Price 70 points 10% Bidding Preference 23 points MTS also sets performance standards, financial incentives, and liquid damages. These are shown in the Table 10-4. The Contractor Perspective The District Manager at First Transit reported that the livable wages clause included in the RFP helped to drive the company to meet the high standards for wages. The responsible wage requirement “helps maintain a level of wages that are competi- tive” and, in turn, helps to prevent a high turnover rate. The District Manager also commented on the incentives and disincentives included in the RFP. “We have met the highest level of incentive thresholds for productivity for the past four years,” he explains. He said that the incentives and disincen- tives were set “at a level where the dollar level wasn’t significant enough.” He noted that instead of financial motivation, cus- tomer service and good business practice are instead drivers for service. The District Manager noted that the responsible wage requirement only applies to vehicle operators that are not cov- ered by a collective bargaining agreement. First Transit oper- ates under labor contracts now and it is expected that when the company responds to the June 2009 RFP, the responsible wage requirement will not be applicable. Reported Results Despite the focus in the procurement on workforce stability, it was reported that turnover has continued to be a problem over the past few years running at “upwards of 100%” according to the First Transit District manager. With the economic down- turn, the turnover rate has decreased and has been running at about 40% for the past year. San Mateo County Transit District (SamTrans), San Mateo, CA The San Mateo County Transit District is the administrative body for the principal public transit and transportation pro- grams in San Mateo County: SamTrans bus service, Redi- Wheels paratransit service, Caltrain commuter rail, and the 120 Performance Measure Incentive LiquidatedDamages Contractor shall achieve a monthly no- show rate of under 5% $2,000 per each month no-show rate is below 5% Any month in which no-shows are greater than 7.5% may carry a damage of $1,000, and $2,000 in which no- shows are greater than 10% Contractor shall ensure that all trips arrive within the established MTS On-Time Performance Window $5,000 per month may be paid Contractor for each month that 90% or more of trips arrive in the MTS established On-Time Window none Contractor shall ensure that hold times don’t exceed an average of two (2) minutes None $5,000 for each month where average hold times exceed two minutes Table 10-4. MTS performance standards, incentives, and liquidated damages.

San Mateo County Transportation Authority. Caltrain and the Transportation Authority have contracted with the District to serve as their managing agency, under the direction of their appointed boards. The SamTrans fixed-route bus system con- sists of 54 routes (44 operated by the District and 10 contracted to MV Transportation), which carry nearly 50,000 passengers on an average weekday. The District’s paratransit service, Redi- Wheels, transports approximately 1,000 customers every day on 83 buses, vans, and sedans, with some additional taxi ser- vice. RediCoast operates nine vehicles on the coastside and provides about 100 rides each day. Use of Contractors for ADA Paratransit Redi-Wheels, RediCoast, and a portion of fixed-route service are contracted to MV Transportation. For Redi-Wheels service, SamTrans performs ADA eligibility and marketing and owns, maintains, and fuels 59 vehicles. MV Transportation manages the remaining day-to-day operations. MV Transportation provides 15 vehicles, all sedans. MV has about 110 vehicle operators. Procurement/Contractual Provisions In the survey, SamTrans reported that it had significant suc- cess with specifying a minimum wage rate and incentives and disincentives relating to an adequate workforce in its procure- ment and contracting documents. SamTrans emphasizes the importance of an experienced workforce in both the pre-bid meeting and in the RFP, stating specifically that operators must be fairly compensated with competitive wages and ben- efits. While SamTrans legally cannot require a specific pay scale, the transit district consistently places strong emphasis on a stable workforce, and staff monitors the contractor to ensure a competitive wage is provided. The most recent RFP contained a specific section on Para- transit Operator Longevity, which is closely monitored by SamTrans throughout the duration of the contract: It is of paramount importance to the District and in the best interest of its customers that Paratransit Operators are not only properly trained, but gain hands-on experience in their craft. It has been the District’s experience that a high turnover rate among Paratransit Operators reduces overall service quality through lack of efficiency and familiarity with the areas in which they operate. In order to indicate a high level of commitment, a Contractor must encourage and promote longevity of its Paratransit Opera- tors. Proposers are required to complete and submit Appendix D, “Staffing Plan Summary” and Appendix E, “Wage and Benefits Summary,” and disclose a plan to accomplish this end with its Proposal. Proposers should disclose information such as award programs and other incentives offered to their Paratransit. There is also a monetary penalty if the contractor is not able to meet the daily demand or maintain at least a 90% on- time performance level. If the contractor fails to provide an adequate number of vehicle operators to meet the required level of service as defined in the contract, a $1,500 fine is insti- tuted. The contract also clearly states that no trips shall be missed or dropped due to unavailability of operators, and the contractor is fined $500 for each missed trip. The Contractor Perspective The General Manager for MV Transportation reported that “We have a low turnover rate at Redi-Wheels, mainly because we have a very good pay rate and fringe benefits.” Employees receive 100% full health benefits, paid by MV Transportation, which equates to about $10 per hour for health benefits on top of their hourly wage. As a result, the general manager esti- mated that the annual turnover rate is about 10% which he felt was “incredible in our industry.” He also comments on the current economic climate, which has dramatically changed operator recruitment: “Before, it was difficult to find opera- tors in the Bay area because there is so much competition for jobs in other sectors. Now, I’m finding 10–20 people a month looking for employment.” As for financial incentives outlined in the contract, the gen- eral manager reported that bonuses and disincentives in the contract have worked “substantially.” He said that four of the standards, productivity, on-time performance, accidents/ safety, and wait time on the phone, have huge bonuses and repercussions for MV Transportation if the company does not meet the standards. He reported that these financial repercus- sions influence his business decisions, saying “It is cheaper for me to add a person to the reservations taking function than to exceed the standards for wait time on the phone.” Currently, MV Transportation meets Redi-Wheels’ 90% on-time per- formance standard. The general manager said that the com- pany has been at this 90% level for a long time, and he is trying to figure out how to improve it, but so far has been unsuccess- ful. As for productivity, he reported that the service operated at about 1.5 to 1.6 trips per revenue-hour. Reported Results The SamTrans Accessibility Coordinator reported the paratransit contractor experiences extremely low turnover rates, especially in comparison to others in the region. She noted that by paying just $1 to $2 more per hour, operator turnover was reduced significantly, making a clear case that paying a higher wage dramatically reduces turnover. She also noted that she believes the more experienced operators tend to be safer and more efficient, which is both a financial and a community benefit. It was noted that while the monetary penalties have acted as an incentive for on-time performance, they have yet to be leveraged with the current contractor, who has consistently been able to meet the 90% on-time performance rate. 121

SamTrans also recognizes good performance by individu- als and reinforces good behavior by making both the transit district and contractor employees eligible for the “I Made a Difference” award. The award, generally an honor rather than a monetary award, is usually presented by a supervisor to an operator while mid-route. The award has created a good atmosphere and appreciation in the workplace, which was felt by managers to contribute to maintaining a stable vehicle operator workforce. King County Metro Transit (Metro), Seattle/King County, WA King County Metro Transit (Metro) is a public transit agency serving more than 1.7 million residents in King County, Washington. Metro operates a fleet of about 1,300 vehicles, including standard and articulated coaches, electric trolleys, dual-powered buses and hybrid diesel-electric buses that serve an annual ridership of 100 million in a 2,134 square mile area. In addition, Metro operates the largest publicly owned vanpool program in the country, with more than 600 vans providing transportation to 5,000 people every day. Metro also manages Access paratransit service, its ADA paratransit service. The program provides next-day, shared rides within three-quarters of a mile on either side of non- commuter fixed-route bus service during the hours and days of operation those routes are in service. In 2007, Access ser- vice provided over 1.1 million rides with a fleet of 300 vans. Use of Contractors for ADA Paratransit Metro contracts its Access paratransit service call center to First Transit, who manages scheduling, reservations, and dis- patching. Two other private companies are then under con- tract to Metro to provide vehicle operation and maintenance. The service provider contractors are Veolia Transportation, which operates about 70% of the runs, and Solid Ground, a local non-profit organization that operates about 30% of the service. Procurement/Contractual Provisions In the survey, Metro reported that it had moderate suc- cess with including language in the solicitation indicating that a stable, experienced vehicle operator workforce was expected. Metro Transit also noted a specific points system used in the evaluation of prospective contractor proposals. The following language is included in the 5-year service provider contracts: The Contractor shall ensure that sufficient staff are hired and retained to meet this Contract’s service requirements. The County reserves the right to reduce the Contractor’s monthly invoice appropriately for any management or supervisory position such as Project, Operations, Information Service or Maintenance Manager, left vacant for more than sixty (60) Days. The Contractor’s provision of qualified, capable and experi- enced personnel is essential to the performance of its contractual obligations herein. As such, failure to provide suitable personnel consistent with the County’s contractual expectations as set forth herein shall be deemed a material breach of contract and subjects the Contract to immediate termination at the County’s option. The Contractor shall ensure that its employees are qualified, capable and suitable to perform the requirements of this Con- tract and the County reserves the right to provide input to the Contractor in determining the suitability of any employee to con- tinue performing the work pursuant to this Contract. The Con- tractor shall provide all pertinent employee records regarding incidents/accidents, passenger complaints, etc., to King County as soon as possible upon request. The County recognizes that the strength of its transportation program is built upon the strength of its operators. Proposers are asked to consider how they will hire and retain an excellent workforce. Metro assigns points when evaluating RFPs to best analyze the proposed services. Typically, vehicle operator recruitment and retention comprise 18–20% of the total score. Table 10-5, 122 Criteria Points Percent of Total Training program 25 2.5% Plan to recruit, train staff and perform the work 50 5.0% Evaluation of proposed team and key persons 45 4.5% Proven ability to collaborate with contractor’s staff 20 2.0% Plan to transition staff who are currently employed with another operator so that service is not disrupted 75 7.5% Record keeping and retention plan 25 2.5% Customer service plan 75 7.5% Pricing 200 20.0% Other (specifics in contract) 515 51.5% Table 10-5. King County Metro proposal evaluation criteria and points.

adapted from a recent RFP, shows the evaluation criteria and points. Metro also includes a liquidated damage for runs that are dropped due to a lack of vehicles or operators. The relevant section reads as follows: The Contractor acknowledges that the provision of services pursuant to this Contract entails providing specialized, public transportation services, and that it is essential that safe, reliable, and efficient service is provided at all times. Liquidated damages may be assessed, at the option of the County, in the circum- stances detailed in the table set forth below. Reported Results Metro indicated that it is difficult to determine the impacts of these procurement strategies at this point because the con- tracts have just been awarded. A previous contract contained only minimum wage standards, which seemed to raise issues as several of the contract providers have had union repre- sented operators. In addition to increasing wage require- ments in the latest RFP, Metro removed the incentives related to run coverage that were included in past contracts. They indicated that the incentives in prior contracts related to run coverage didn’t seem to affect contractor behavior, so they replaced them this time around with liquidated damages. It was noted that vehicle operator turnover is a significant problem for King County. A commonly cited issue in retain- ing paratransit operators is that they often leave the industry for higher paying industrial jobs since they are required to also maintain commercial drivers’ licenses. Metro is considering eliminating the CDL requirement, but still requiring the train- ing to address the same content as in the CDL training. It was noted that operator retention has been better at Solid Ground. Metro indicated that this appeared to be partly due to the more extensive fringe benefits provided by this contractor. Metro managers noted that they have recently established a new bid model with flexible start times which can vary within 1–2 hours per day. Operators will receive notification the day prior to service as to when they will begin work the following day. More and more operators have been sent home before a shift’s end when late cancellations have allowed routes to be closed early and rides to be moved. 123 Item Requirement Liquidated Damage - Cost 1 Route dropped or reassigned due to unavailable vehicle or operator Perform all routes VSHs as assigned $1.5 times cost for replacement service per VSH

TRB’s Transit Cooperative Research Program (TCRP) Report 142: Vehicle Operator Recruitment, Retention, and Performance in ADA Complementary Paratransit Operations provides guidance for understanding the relationships that influence and enhance operator recruitment, retention, and performance in Americans with Disabilities Act (ADA) complementary paratransit services.

Appendixes to TCRP Report 142 were published electronically as TCRP Web-Only Document 50 : Survey Instrument, Productivity Charts, and Interview Protocol for Case Studies for TCRP Report 142.

READ FREE ONLINE

Welcome to OpenBook!

You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

Do you want to take a quick tour of the OpenBook's features?

Show this book's table of contents , where you can jump to any chapter by name.

...or use these buttons to go back to the previous chapter or skip to the next one.

Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

To search the entire text of this book, type in your search term here and press Enter .

Share a link to this book page on your preferred social network or via email.

View our suggested citation for this chapter.

Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

Get Email Updates

Do you enjoy reading reports from the Academies online for free ? Sign up for email notifications and we'll let you know about new publications in your areas of interest when they're released.

KPMG Personalization

  • Home ›
  • Insights ›

Case Study: Transform a Procurement Organization

Investco’s purchasing demands were growing faster than their procurement capabilities could handle—the process was at a breaking point.

sticky-notes

Despite a time of economic instability with headlines depicting a grim global economy plagued with debt crises, financial volatility, and lower commodity prices, Investco has continued to sustain its competitive advantage in hedge fund management. Similar investment companies recorded portfolio losses, while Investco experienced unprecedented growth, expanding its client roster, maintaining and improving historical returns, and substantially increasing the number of its personnel during this period.

Although Investco retained a competitive advantage, the company was growing organically faster than internal processes could adapt to scale and new demands. This growth challenge was exacerbated by the current procurement practices which varied by business unit with limited enterprise-wide standards or policy. Lengthy cycle times and redundant activities were common across the procurement to pay cycle as a result of this rapid growth and nonstandardized approach. Adding to the challenge, the existing procurement tool, a custom-developed solution, was inflexible and inefficient. While the tool was fixed and rigid, individual business unit processes and approaches were not. Some business units used purchase orders, where others did not. Each business unit had a variety of process and review steps for purchasing goods and services. The legal review process for contracts was not differentiated or scalable based on type of purchase, and the review steps were not consistently applied. Spend authorization thresholds were low relative to the large number of purchases at a smaller dollar value and had not been adjusted to reflect growth. For example, a $50 software license renewal went through the same review stages (technology, legal, and sourcing) as a one-off $100,000 specific piece of IT equipment. Investco’s existing tool did not have workflow capabilities that would meet the new needs of the business, and concerns existed regarding scalability. The inflexible workflow issues combined with poorly designed process also led to late engagement of the required reviewers. For example, a purchase would frequently go through sourcing or contract review before technology review.

The impact of these inefficient processes was being felt as a constraint to leveraging third party goods and services to support firm growth. When the firm identified a need for a new procurement software tool to address these constraints, KPMG was chosen to assist Investco with the selection of the tool and the initial design of the new procurement solution.

© 2024 KPMG LLP, a Delaware limited liability partnership and a member firm of the KPMG global organization of independent member firms affiliated with KPMG International Limited, a private English company limited by guarantee. All rights reserved.

For more detail about the structure of the KPMG global organization please visit https://kpmg.com/governance .

Some or all of the services described herein may not be permissible for KPMG audit clients and their affiliates or related entities. Any trademarks or service marks herein are the property of their respective owners.

Connect with us

  • Find office locations kpmg.findOfficeLocations
  • Email us kpmg.emailUs
  • Social media @ KPMG kpmg.socialMedia
  • Request for proposal

case study project procurement management

Pardon Our Interruption

As you were browsing something about your browser made us think you were a bot. There are a few reasons this might happen:

  • You've disabled JavaScript in your web browser.
  • You're a power user moving through this website with super-human speed.
  • You've disabled cookies in your web browser.
  • A third-party browser plugin, such as Ghostery or NoScript, is preventing JavaScript from running. Additional information is available in this support article .

To regain access, please make sure that cookies and JavaScript are enabled before reloading the page.

Information

  • Author Services

Initiatives

You are accessing a machine-readable page. In order to be human-readable, please install an RSS reader.

All articles published by MDPI are made immediately available worldwide under an open access license. No special permission is required to reuse all or part of the article published by MDPI, including figures and tables. For articles published under an open access Creative Common CC BY license, any part of the article may be reused without permission provided that the original article is clearly cited. For more information, please refer to https://www.mdpi.com/openaccess .

Feature papers represent the most advanced research with significant potential for high impact in the field. A Feature Paper should be a substantial original Article that involves several techniques or approaches, provides an outlook for future research directions and describes possible research applications.

Feature papers are submitted upon individual invitation or recommendation by the scientific editors and must receive positive feedback from the reviewers.

Editor’s Choice articles are based on recommendations by the scientific editors of MDPI journals from around the world. Editors select a small number of articles recently published in the journal that they believe will be particularly interesting to readers, or important in the respective research area. The aim is to provide a snapshot of some of the most exciting work published in the various research areas of the journal.

Original Submission Date Received: .

  • Active Journals
  • Find a Journal
  • Proceedings Series
  • For Authors
  • For Reviewers
  • For Editors
  • For Librarians
  • For Publishers
  • For Societies
  • For Conference Organizers
  • Open Access Policy
  • Institutional Open Access Program
  • Special Issues Guidelines
  • Editorial Process
  • Research and Publication Ethics
  • Article Processing Charges
  • Testimonials
  • Preprints.org
  • SciProfiles
  • Encyclopedia

asi-logo

Article Menu

case study project procurement management

  • Subscribe SciFeed
  • Recommended Articles
  • Google Scholar
  • on Google Scholar
  • Table of Contents

Find support for a specific problem in the support section of our website.

Please let us know what you think of our products and services.

Visit our dedicated information section to learn more about MDPI.

JSmol Viewer

Intelligent procurement scheduling system for items involving public procurement.

case study project procurement management

1. Introduction

2. materials and methods.

  • y * is the defuzzified (crisp) output value;
  • y is a variable representing points in the domain of the output fuzzy set;
  • µ B ( y ) is the membership function of the aggregated fuzzy output set.

3. Results and Discussion

4. conclusions, author contributions, data availability statement, conflicts of interest.

  • Siciliani, L.; Taccardi, V.; Basile, P.; Di Ciano, M.; Lops, P. AI-based decision support system for public procurement. Inf. Syst. 2023 , 119 , 102284. [ Google Scholar ] [ CrossRef ]
  • Guo, L.; Liu, Q.; Shi, K.; Gao, Y.; Luo, J.; Chen, J. A blockchain-driven electronic contract management system for commodity procurement in electronic power industry. IEEE Access 2021 , 9 , 9473–9480. [ Google Scholar ] [ CrossRef ]
  • Hung, M.-C.; Chen, A.-P.; Yu, W.-T. AI-driven intraday trading: Applying machine learning and market activity for enhanced decision support in financial markets. IEEE Access 2024 , 12 , 12953–12962. [ Google Scholar ] [ CrossRef ]
  • Wang, K.; Zipperle, M.; Becherer, M.; Gottwalt, F.; Zhang, Y. An AI-based automated continuous compliance awareness framework (CoCAF) for procurement auditing. Big Data Cogn. Comput. 2020 , 4 , 23. [ Google Scholar ] [ CrossRef ]
  • Ezeji, C.L. Artificial Intelligence for detecting and preventing procurement fraud. Int. J. Bus. Excell. 2024 , 6 , 63–73. [ Google Scholar ] [ CrossRef ]
  • Kaushik, A.; Singh, D. Performance evaluation of advanced manufacturing technologies in small and medium enterprises located in Northern India. Int. J. Bus. Excel. 2022 , 26 , 281. [ Google Scholar ] [ CrossRef ]
  • Ershadi, M.; Jefferies, M.; Davis, P.; Mojtahedi, M. Barriers to achieving sustainable construction project procurement in the private sector. Clean. Eng. Technol. 2021 , 3 , 100125. [ Google Scholar ] [ CrossRef ]
  • Ge, Y. Quality control in food supply chain with dynamic quality characteristics. J. Control. Decis. 2021 , 9 , 253–263. [ Google Scholar ] [ CrossRef ]
  • Sillanpää, V.; Liesiö, J.; Käki, A. Procurement decisions over multiple periods under piecewise-linear shortage costs and fixed capacity commitments. Omega 2021 , 100 , 102207. [ Google Scholar ] [ CrossRef ]
  • Dotoli, M.; Epicoco, N.; Falagario, M. Multi-Criteria Decision Making techniques for the management of public procurement tenders: A case study. Appl. Soft Comput. 2020 , 88 , 106064. [ Google Scholar ] [ CrossRef ]
  • Kärkkäinen, L.; Haakana, H.; Hirvelä, H.; Packalen, T. Using a decision support system to study impacts of land use policies on wood procurement possibilities of the sawmill industry—A case study at regional and municipal levels. For. Policy Econ. 2019 , 103 , 136–146. [ Google Scholar ] [ CrossRef ]
  • Shafiq, M.; Savino, M.M. Supply chain coordination to optimize manufacturer’s capacity procurement decisions through a new commitment-based model with penalty and revenue-sharing. Int. J. Prod. Econ. 2019 , 208 , 512–528. [ Google Scholar ] [ CrossRef ]
  • Mikkonen, K.; Niskanen, H.; Pynnönen, M.; Hallikas, J. The presence of emotional factors: An empirical exploration of bundle purchasing process. Telecommun. Policy 2015 , 39 , 642–657. [ Google Scholar ] [ CrossRef ]
  • Zhang, M. Decision-making processes in academic libraries: How did academic librarians purchase e-book products? J. Acad. Librariansh. 2020 , 46 , 102252. [ Google Scholar ] [ CrossRef ]
  • Backstrand, J.; Suurmond, R.; van Raaij, E.; Chen, C. Purchasing process models: Inspiration for teaching purchasing and supply management. J. Purch. Supply Manag. 2019 , 25 , 100577. [ Google Scholar ] [ CrossRef ]
  • Lorentziadis, P.L. Competitive bidding in asymmetric multidimensional public procurement. Eur. J. Oper. Res. 2020 , 282 , 211–220. [ Google Scholar ] [ CrossRef ]
  • Tchokogué, A.; Merminod, N. The purchasing department’s leadership role in developing and maintaining a preferred customer status. J. Purch. Supply Manag. 2021 , 27 , 100686. [ Google Scholar ] [ CrossRef ]
  • Zhang, J.; Dao, S.D.; Zhang, W.; Goh, M.; Yu, G.; Jin, Y.; Liu, W. A new job priority rule for the NEH-based heuristic to minimize makespan in permutation flowshops. Eng. Optim. 2023 , 55 , 1296–1315. [ Google Scholar ] [ CrossRef ]
  • Guo, T.-D.; Liu, Y.; Han, C.-Y. An overview of stochastic quasi-Newton methods for large-scale machine learning. J. Oper. Res. Soc. China 2023 , 11 , 245–275. [ Google Scholar ] [ CrossRef ]
  • Mitchell, T.M. Machine Learning ; McGraw-Hill: New York, NY, USA, 1997. [ Google Scholar ]
  • Alpaydin, E. Introduction to Machine Learning , 4th ed.; MIT Press: Cambridge, MA, USA, 2020. [ Google Scholar ]
  • Shalev-Shwartz, S.; Ben-David, S. Understanding Machine Learning: From Theory to Algorithms ; Cambridge University Press: Cambridge, UK, 2014. [ Google Scholar ]
  • Zadeh, L.A.; Aliev, R.A. Fuzzy Logic Theory and Applications: Part I and Part II ; World Scientific: Singapore, 2018. [ Google Scholar ]
  • Ecer, F.; Torkayesh, A.E. A stratified fuzzy decision-making approach for sustainable circular supplier selection. IEEE Trans. Eng. Manag. 2024 , 71 , 1130–1144. [ Google Scholar ] [ CrossRef ]
  • Agami, N.; Saleh, M.; Rasmy, M. An innovative fuzzy logic based approach for supply chain performance management. IEEE Syst. J. 2014 , 8 , 336–342. [ Google Scholar ] [ CrossRef ]
  • Ghasemi, B.; Khalijian, S.; Daim, T.U.; Mohammadipirlar, E. Knowledge management performance measurement based on world-class competitive advantages to develop strategic-oriented projects: Case of Iranian oil industry. Technol. Soc. 2021 , 67 , 101691. [ Google Scholar ] [ CrossRef ]
  • Salehi, S.; Robles-Velasco, A.; Seyedzadeh, A.; Ghazali, A.; Davoudiseresht, M. A hybrid knowledge-based method for pipe renewal planning in water distribution systems with limited data: Application to Iran. Util. Policy 2022 , 78 , 101407. [ Google Scholar ] [ CrossRef ]
  • Pabolu, V.K.R.; Shrivastava, D.; Kulkarni, M.S. Modelling and prediction of worker task performance using a knowledge-based system application. Int. J. Prod. Econ. 2022 , 254 , 108657. [ Google Scholar ] [ CrossRef ]
  • Azeem, H.; Yellasiri, S.; Jammala, V.; Naik, B.S.; Panda, A.K. A fuzzy logic based switching methodology for a cascaded H-bridge multi-level inverter. IEEE Trans. Power Electron. 2019 , 34 , 9360–9364. [ Google Scholar ] [ CrossRef ]
  • Moudoud, B.; Aissaoui, H.; Diany, M. Fuzzy adaptive sliding mode controller for electrically driven wheeled mobile robot for trajectory tracking task. J. Control. Decis. 2022 , 9 , 71–79. [ Google Scholar ] [ CrossRef ]
  • Ali, M.; Adnan, M.; Tariq, M.; Poor, H.V. Load forecasting through estimated parameterized based fuzzy inference system in smart grids. IEEE Trans. Fuzzy Syst. 2021 , 29 , 156–165. [ Google Scholar ] [ CrossRef ]
  • Movassaghi, M.; Darestani, S.A. Multiple cross-docks scheduling with multiple doors using fuzzy approach and metaheuristic algorithms. J. Oper. Res. Soc. China 2020 , 10 , 861–911. [ Google Scholar ] [ CrossRef ]
  • Schotanus, F.; Engh, G.V.D.; Nijenhuis, Y.; Telgen, J. Supplier selection with rank reversal in public tenders. J. Purch. Supply Manag. 2022 , 28 , 100744. [ Google Scholar ] [ CrossRef ]
  • Sunmola, F.T.; Shehu, Y.U. A case study on performance features of electronic tendering systems. Procedia Manuf. 2020 , 51 , 1586–1591. [ Google Scholar ] [ CrossRef ]
  • Mustapha, S.M.F.D.S. Predictive analysis of students’ learning performance using data mining techniques: A comparative study of feature selection methods. Appl. Syst. Innov. 2023 , 6 , 86. [ Google Scholar ] [ CrossRef ]
  • Zhou, S.; Li, T.; Li, Y. Recursive feature elimination based feature selection in modulation classification for MIMO systems. Chin. J. Electron. 2023 , 32 , 785–792. [ Google Scholar ] [ CrossRef ]
  • Wu, J.; Su, H.; Meng, J.; Lin, M. State of health estimation for lithium-ion battery via recursive feature elimination on partial charging curves. IEEE J. Emerg. Sel. Top. Power Electron. 2023 , 11 , 131–142. [ Google Scholar ] [ CrossRef ]

Click here to enlarge figure

Item Classification2019–20202020–2021Average Days
ElevatorControl System180165172.5
Corrug. claddingThermal Insulation200132166
TransducersControl System130160145
Plain claddingThermal Insulation90180135
Inst. CableControl System156112134
Ceramic fiberThermal Insulation120100110
ActuatorsControl System98120109
CastablesThermal Insulation14072106
Teflon hosesControl System12086103
PourablesThermal Insulation9610299
SwitchesControl System1097592
Junction boxesControl System977586
Control boxesControl System5611686
EM valveControl System1204683
Control cablesControl System868083
Rock fiberThermal Insulation758479.5
FittingsControl System618975
Metal MeshThermal Insulation806874
Pneu. tubesControl System519573
ItemCriticalityVariantsCompetitionBuying FrequencyValueAverage Weeks
Rock fiber30121011>1006 to 8
Ceramic fiber41645414 to 16
Castables152648214 to 16
Pourables131642612 to 14
Metal Mesh11852106 to 8
Corrug. cladding18352>10018 to 20
Plain cladding10451>10018 to 20
EM valve92221210 to 12
Transducers37524018 to 20
Actuators2462>10014 to 16
Control cables631556510 to 12
Inst. Cable121511818 to 20
Jun. Boxes9154410 to 12
Switches9122810 to 12
Elevator2252>10018 to 20
Fittings45062108 to 10
Control boxes2151210 to 12
Teflon hoses34621.514 to 16
Pneu. tubes1661714 to 16
CriticalityVariantsCompetitionBuying FrequencyValueNorms
HIGHMULTIPLEHIGHHIGHHIGHNORMAL
LOWMULTIPLEHIGHHIGHHIGHNORMAL
HIGHLESSHIGHHIGHHIGHNORMAL
LOWLESSHIGHHIGHHIGHNORMAL
HIGHMULTIPLELOWHIGHHIGHLONG
LOWMULTIPLELOWHIGHHIGHLONG
HIGHLESSLOWHIGHHIGHLONG
LOWLESSLOWHIGHHIGHLONG
HIGHMULTIPLEHIGHMEDHIGHSHORT
LOWMULTIPLEHIGHMEDHIGHNORMAL
HIGHLESSHIGHMEDHIGHSHORT
LOWLESSHIGHMEDHIGHNORMAL
HIGHMULTIPLELOWMEDHIGHLONG
LOWMULTIPLELOWMEDHIGHLONG
HIGHLESSLOWMEDHIGHNORMAL
LOWLESSLOWMEDHIGHLONG
HIGHMULTIPLEHIGHLOWHIGHSHORT
LOWMULTIPLEHIGHLOWHIGHLONG
HIGHLESSHIGHLOWHIGHSHORT
LOWLESSHIGHLOWHIGHNORMAL
HIGHMULTIPLELOWLOWHIGHLONG
LOWMULTIPLELOWLOWHIGHLONG
HIGHLESSLOWLOWHIGHLONG
LOWLESSLOWLOWHIGHLONG
HIGHMULTIPLEHIGHHIGHLOWNORMAL
LOWMULTIPLEHIGHHIGHLOWNORMAL
HIGHLESSHIGHHIGHLOWSHORT
LOWLESSHIGHHIGHLOWSHORT
HIGHMULTIPLELOWHIGHLOWSHORT
LOWMULTIPLELOWHIGHLOWNORMAL
HIGHLESSLOWHIGHLOWNORMAL
LOWLESSLOWHIGHLOWNORMAL
HIGHMULTIPLEHIGHMEDLOWSHORT
LOWMULTIPLEHIGHMEDLOWSHORT
HIGHLESSHIGHMEDLOWSHORT
LOWLESSHIGHMEDLOWSHORT
HIGHMULTIPLELOWMEDLOWLONG
LOWMULTIPLELOWMEDLOWLONG
HIGHLESSLOWMEDLOWLONG
LOWLESSLOWMEDLOWNORMAL
HIGHMULTIPLEHIGHLOWLOWNORMAL
LOWMULTIPLEHIGHLOWLOWNORMAL
HIGHLESSHIGHLOWLOWSHORT
LOWLESSHIGHLOWLOWLONG
HIGHMULTIPLELOWLOWLOWSHORT
LOWMULTIPLELOWLOWLOWSHORT
HIGHLESSLOWLOWLOWLONG
LOWLESSLOWLOWLOWNORMAL
Variable TypeVariable NameFuzzy SetDataRange
InputCriticalityLOW(1–20)
InputCriticalityHIGH(15–30)
InputVariantsLESS(1–10)
InputVariantsMULTIPLE(5–30)
InputCompetitionLOW(1–7)
InputCompetitionHIGH(5–15)
InputBuying frequencyLOW(1–5)
InputBuying frequencyMEDIUM(2.5–6.5–11)
InputBuying frequencyHIGH(7.5–12)
InputTender valueLOW(1–40)
InputTender valueHIGH(40–100)
OutputFinalization periodSHORT(1–60)
OutputFinalization periodNORMAL(50–75–120)
OutputFinalization periodLONG(100–180)
Criticality
Factor
Variants (No)Competition
(No)
Buying
Frequency
per Annum
Tender
Value
(Rs. Lakhs)
Purchase Request to Contract Finalization Duration
(Actual Days)(Predicted Days)
221512104140.1
555450142143
251108>1005658.1
302126754040.4
1055558581.5
1030156>1008080.8
10301512>1008080.8
30301512>1007880.8
3030156>1003639.7
3030158>1005655.7
3010158>1006669.3
1010158>1007881.9
The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

Muniswamy, N.; Palanisamy, P. Intelligent Procurement Scheduling System for Items Involving Public Procurement. Appl. Syst. Innov. 2024 , 7 , 81. https://doi.org/10.3390/asi7050081

Muniswamy N, Palanisamy P. Intelligent Procurement Scheduling System for Items Involving Public Procurement. Applied System Innovation . 2024; 7(5):81. https://doi.org/10.3390/asi7050081

Muniswamy, Nadanakumar, and Parthiban Palanisamy. 2024. "Intelligent Procurement Scheduling System for Items Involving Public Procurement" Applied System Innovation 7, no. 5: 81. https://doi.org/10.3390/asi7050081

Article Metrics

Article access statistics, further information, mdpi initiatives, follow mdpi.

MDPI

Subscribe to receive issue release notifications and newsletters from MDPI journals

IMAGES

  1. Solved Project Procurement Management Activity: Case Study

    case study project procurement management

  2. What is Project Procurement Management?

    case study project procurement management

  3. Project Procurement Management

    case study project procurement management

  4. Project Procurement Management According to the PMBOK

    case study project procurement management

  5. Procurement management plan

    case study project procurement management

  6. The Guide To Project Procurement Management

    case study project procurement management

VIDEO

  1. Project Procurement Management

  2. Project Procurement Management

  3. CSM726 Assignment 3 Group 6

  4. 42 Project Procurement Management

  5. PMP 5th

  6. Procurement management RPA case study

COMMENTS

  1. Procurement Case Studies

    Procurement case studies are real-word examples that provide valuable insights into the complexities of negotiation. Whether in international relations, business disputes, or organizational conflicts, parties must invest time in building trust. Cultural differences can significantly impact the negotiation process.

  2. 10 Procurement Case Studies: Examples & Lessons Learned in '24

    Lessons learned. The case demonstrates the benefits of consolidating and centralizing procurement systems, leveraging real-time data and insights for strategic decision-making, and using intelligent category management to improve efficiency, cost savings, and risk management in procurement. 3. Real-life example from the healthcare sector.

  3. Project Management Case Studies

    The case study library highlights how organizations are implementing project management practices to fulfill business initiatives and overcome challenges. ... Our collection of featured case studies highlights how organizations are implementing project management practices and using PMI products, programs or services to fulfill business ...

  4. Turning Procurement Around: 6 Case Studies of Success

    Case Study #3: IBM. IBM, one of the world's largest technology companies, has also faced its fair share of procurement challenges. However, through strategic initiatives and innovative approaches, they have successfully turned their procurement around. One key aspect that contributed to IBM's success was their focus on supplier relationships.

  5. Risk on Complex Projects : a Case Study

    Fosters decision-making thinking (NASA, 2008). This paper has presented a case study about a very complex project: the engineering design, procurement, and construction of a 400,000 barrel oil refinery. We hope that you have learned about risk on complex projects and mitigation of risk in the design and procurement phases.

  6. Project Procurement Management

    Project Procurement Management. Book Editor(s): Dragan Z. Milosevic, Search for more papers by this author. Peerasit Patanakul, ... Case Studies in Project, Program, and Organizational Project Management. Related; Information; Close Figure Viewer. Return to Figure. Previous Figure Next Figure.

  7. Procurement Strategy Case Studies

    InDemand's co-creation model. Copenhagen supplies seasonal and diverse organic fruit and vegetables. Catalonia's aim to clean air. The Ministry of Defense of the Kingdom of the Netherlands procuring textiles. Combining procurement models. Procurement Expert's Insights. Conclusion. Frequently Asked Questions.

  8. PDF The Chunnel Project

    The case study is structured to allow an evaluation of the appropriate processes of various Project Management Knowledge Areas at the end of each phase. An overall assessment of performance is then conducted, resulting in a numeric evaluation of the management of this project, including areas of strength, opportunities for

  9. Project Procurement Management: A Quick Guide

    Procurement management is a way to more efficiently and productively handle the process of sourcing, requisitioning, ordering, expediting, inspecting and reconciliation of procurement. However, before making partnerships or purchases, the question of whether the goods and services are required from outside vendors must be answered.

  10. Successful Procurement Turnaround: 6 Case Studies to Inspire

    Case Study #1: Johnson & Johnson. Johnson & Johnson, a multinational pharmaceutical and consumer goods company, faced significant procurement challenges that required a successful turnaround. With an extensive product portfolio and complex supply chain, they needed to optimize their procurement processes for cost savings and efficiency.

  11. Supply Chain Case Studies & Procurement Case Studies

    KEY INSIGHTS. Procurement and supply chain leaders worldwide look to GEP for process, technology and industry expertise, and we are happy to share our learnings from years of complex problem solving. The GEP Knowledge Bank encompasses proprietary research, issue-orientated white papers and webinars, case studies, and playbooks and primers.

  12. Project Procurement Demystified: Lessons Learned from a Real-Life Case

    The real-life case study of project procurement provides valuable lessons for any organization involved in a similar process. One of the most important takeaways is that communication is key to success. It's essential to establish clear lines of communication with all parties involved, including suppliers and stakeholders.

  13. Better sourcing and procurement for cost savings: Case study

    15% increase in active scrap suppliers. 19.1% increase in alternative grade tonnage. 0.8% reduction in scrap cost. 100% of spend was reviewed with 83% identified as impactable. Contracts or agreements were established on 51% of reviewed spend. 4.3% potential annual spend reduction as locked into agreements amongst procurement teams.

  14. Project procurement management: A structured literature review

    A literature review taking 119 articles in project procurement is presented. ... Project procurement management. Supplier selection. Supplier evaluation. ... cited 194 times and Chen and Wang (2009), with 167 citations and; a case study proposed by Cheng and Li (2004), cited by 166 authors.

  15. PDF Mastering Risk and Procurement in Project Management

    1.8 Case Study (Use for Chapters 1, 2, 3, and 4). . . . . . . . . 36 ... Mastering Risk and Procurement in Project Management has been designed not only to explain basic concepts in risk and pro-curement management, but also to offer tools and techniques that can

  16. PDF Modern Procurement PROCUREMENT CASE STUDIES VICTORIA

    B $8 2. Number of casesTable 2: Example VCG bid structure The VCG solution is to allocate the cases to the bidders with. the lowest bids, so A is awarded one case and B two. Medical expert A's payment is equal to her bid of $6, plus the difference between the sum of the bids in the optimal allocation, $22, and th.

  17. Procurement Consulting Case Studies & Projects

    Procurement Review. Charles Kendall Australia (CKA) was engaged by NSW Health Infrastructure (HI) to review and realign the financial, contractual, procurement and project reporting requirements in its Procure-to-Pay (P2P) process. Migrating HI's $10M in projects and programs from paper-based to electronic procurement management, CKA improved ...

  18. Chapter 10

    TRB's Transit Cooperative Research Program (TCRP) Report 142: Vehicle Operator Recruitment, Retention, and Performance in ADA Complementary Paratransit Operations provides guidance for understanding the relationships that influence and enhance operator recruitment, retention, and performance in Americans with Disabilities Act (ADA) complementary paratransit services.

  19. Case Study: Transform a Procurement Organization

    Case Study: Transform a Procurement Organization. Investco's purchasing demands were growing faster than their procurement capabilities could handle—the process was at a breaking point. Despite a time of economic instability with headlines depicting a grim global economy plagued with debt crises, financial volatility, and lower commodity ...

  20. Case Study Of Project Procurement Management

    Case Study Of Project Procurement Management. It has become clear that the global change and growth in markets, environment, technology, and economy: a more efficient method in procurement management is required for faster service with greater customer satisfaction. According to PMBOK Guide (2013:355) Project Procurement Management is the ...

  21. Project Procurement Management

    Project Procurement Management. Book Editor(s): Dragan Z. Milosevic, Dragan Z. Milosevic. Search for more papers by this author. Peerasit Patanakul, ... Case Studies in Project, Program, and Organizational Project Management. Related; Information; Close Figure Viewer. Return to Figure. Previous Figure Next Figure.

  22. Case Studies in Project, Program, and Organizational Project Management

    The ever expanding market need for information on how to apply project management principles and the PMBOK® contents to day-to-day business situations has been met by our case studies book by Harold Kerzner. That book was a spin-off from and ancillary to his best selling text but has gained a life of its own beyond adopters of that textbook. All indications are that the market is hungry for ...

  23. Final case 1 procurement[1] (docx)

    Management document from University Canada West, 16 pages, 407 ETR Highway Extension: Material Procurement Case Study Analysis Report Raju Romeo Gomes (2302646) Shashank (2242751) Gayathri Ramanayake (2302260) University Canada West OPMT 623- Procurement and Inventory Management Prof. Mazyar Zahedi-Seresht August

  24. Implementation of Environmental Management System: A Case Study for

    This study aims to design an environmental management information system (EMIS) by integrating all necessary environmental documents for project implementation based on ISO 14001:2015 and using an exploratory sequential mixed method of research. The agile project management methodology was also used to speculate how a project must be managed using environmental information. The problems with ...

  25. Intelligent Procurement Scheduling System for Items Involving Public

    The procurement of goods is considered a critical part in supply chain management, and it often has several unprecedented barriers leading to failure of the project. Uncertainties in availability, cost and demand-supply matching combined with stringent government norms andprocurement policies of various organizations need a thorough study in the present-day environment to develop sustainable ...